Switzerland – Engineering services
Original title (Hungarian): Switzerland – Engineering services – N05.60 MP-230028 - BSA Grandson - Areuse renouvellement - APR GC phase MK jusqu'à la mise en service -Phases 31 à 53. (ID 10996)
Office fédéral des routes OFROU, Division Infrastructure routière Ouest, filiale Estavayer-le-Lac · Switzerland government procurement
Closed April 14, 2025. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.
The section runs between km 19.450 and km 29.500 and includes the Vaumarcus overpass, the Sauges Tunnel, the Gorgier Tunnel, the Treytel and Bevaix partial overpasses, and the Chanélaz overpass. The objectives of the contract are: • To conduct studies for the civil engineering works required under the APR BSA (General Project for Road Construction and Maintenance) for the maintenance and rehabilitation of the BSA (Road Construction and Maintenance) facilities of the Onnens overpass, the Concise Tunnel, and the La Lance Tunnel on the A5 motorway between the Grandson and Vaumarcus interchanges. This also includes participation in the implementation of smaller projects, considered individual measures (type MI), in collaboration with UT IX (Technical Authority IX) for the motorway section between the Vaumarcus and Bevaix interchanges. • To conduct studies and, depending on the results, construct seven anti-recirculation walls. These operations will take place between km 19.800 and km 31.000. The following anti-recirculation walls will be studied and implemented depending on the results: - Anti-recirculation wall of the west portal of the Sauges Tunnel - Anti-recirculation wall of the east portal of the Sauges Tunnel - Anti-recirculation wall of the west portal of the Gorgier Tunnel - Anti-recirculation wall of the west portal of the Chanélaz overpass - Anti-recirculation wall of the east portal of the Chanélaz overpass - Anti-recirculation wall of the west portal of the Areuse overpass - Anti-recirculation wall of the east portal of the Areuse overpass. The services of this contract (AP, MK, DP/MP, PP31, 32, 41, 51, 52, 53) correspond to the services of the project designer (PV), which include the following: · the preparation of a variant analysis based on the documents of state 0. · the civil engineering aspects of new infrastructure in connection with the BSA; • The civil engineering aspects of the new foundations and supports required for the signage renewal; •...
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | Office fédéral des routes OFROU, Division Infrastructure routière Ouest, filiale Estavayer-le-Lac |
|---|
| Country | Switzerland |
|---|
| Category | Management Consulting |
|---|
| CPV | 71300000 |
|---|
| Published | February 17, 2025 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | April 14, 2025 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Translation | Translated from Hungarian by GlobalGov’s translation pipeline |
|---|
| Official source | View original notice |
|---|
| Last verified | September 20, 2026 |
|---|
Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.
See every Switzerland Management Consulting opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Switzerland Management Consulting intelligence report in your inbox
A personalized report on Switzerland Management Consulting opportunities, emailed in 5-10 minutes. One per month, no account needed.