The main content of the part of the construction "1.e. 1st construction" proposed in the documentation entitled "Modernization of the Pilsen - Domažlice - St. border of the Federal Republic of Germany, 1st construction, new Pilsen (outside) - Stod (including), 1st stage" is the complete reconstruction of the railway line included in the European TEN-T railway system. This part of the construction addresses the section following the implemented construction "Pilsen Junction, 3rd construction" (Pilsen main station - Nová Hospoda) after the connection to "2nd construction". "1.e. 1st construction" creating the basis of a new double-track line towards Stod according to the approved variant 3b of the update of the Feasibility Study "Modernization of the Pilsen - Domažlice - St. border line". The main content of the construction part "2nd construction" proposed in the documentation "Modernization of the Plzeň - Domažlice - German border line, 2nd construction, section Plzeň (outside) - Nýřany - Chotěšov (outside)" is the reconstruction of the existing line towards Nýřany included in the European railway system TEN-T towards Vejprnice and Nýřany. The construction containing the above-mentioned parts will ensure a comprehensive reconstruction of the railway superstructure and substructure, drainage, spatial permeability UIC GC, UIC D4 line load class, sufficient track capacity, compliance with hygienic noise and vibration limits and parameters given by the technical legislation TSI, electrification, construction of ground facilities, reconstruction of Vejprnice railway station, Nýřany railway station and station. Tlucná with the construction of barrier-free platforms with a boarding edge height of 550 mm above the TK and technological equipment, in particular security and communication equipment with remote control from the local workplace in the Nýřany railway station and a backup workplace from the CDP Prague, including the construction of RBC, GSM-R and the deployment...
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start FreeSource: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.
See every Czech Republic Roads and Highways Infrastructure opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Czech Republic Roads and Highways Infrastructure intelligence report in your inbox
A personalized report on Czech Republic Roads and Highways Infrastructure opportunities, emailed in 5-10 minutes. One per month, no account needed.