Germany – Construction work for water and sewage pipelines – 19/TSch-0112 PISA III ERN

Economic Affairs · Germany government procurement

Closed June 18, 2024. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

For TWL: Replacement of approx. 171 m of drinking water pipe DN 100/125/150 cast iron (GG) with DN 100/150 cast iron (GGGFzm) using trenchless construction according to WN 322. Installation of approx. 339 m of drinking water pipe DN 100/300/400 cast iron (GGG) using open trench construction. Replacement of approx. 526 m of drinking water pipe DN 80/100/125/150/200/250/450 cast iron (GG/dGe) with DN 80/100/150/200/300/400 cast iron (GGG) using open trench construction. Replacement or new installation of approx. 74 m of drinking water pipe DN 25/32/40/50 PE (HA) in protective casing DN 110PE using open trench construction. Installation and removal of approx. 705 m of temporary piping. For sewer: Demolition/new construction of approx. 1,945 m of stormwater, combined, and wastewater sewers DN 250-DN 500 using open trench construction, average depth approx. 3.8 m. Renovation of approx. 351 m of stormwater and wastewater sewers DN 200-DN 300 using cured-in-place pipe (CIPP) lining, including preparatory robotic and packer work, as well as robotic and packer work in the stormwater sewer (egg-shaped profile 500/750). Grouting of approx. 684 m of stormwater sewers DN 250-500. Demolition/new construction/repair of approx. 71 manholes and one chamber structure. New construction/repair of approx. 34 street drains. Road construction: final restoration of the roadway of approx. 4,978 m² in asphalt construction, of which approx. 4,978 m² is asphalt on the roadway or sub-concrete, and approx. 412 m² is paved, as well as final... Restoration of pedestrian and cycle paths using paving stones (approx. 850 m²)

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyEconomic Affairs
CountryGermany
CategoryRoads and Highways Infrastructure
CPV45231300
PublishedApril 23, 2024
Procurement stageActive solicitation
ClosedJune 18, 2024
StatusClosed — no longer accepting responses
TranslationTranslated from Hungarian by GlobalGov’s translation pipeline
Official sourceView original notice
Last verifiedAugust 12, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in Germany

Germany - International payment transfer services - 10-VST-E-2023
Klärwerk schönerlinde, flocking filtration, VE 08 E-MSR - technique
Germany – Architectural, construction, engineering and inspection services – Vorbereitende Dienstleistungen für Photovoltaik-Projekte
Germany – Construction work – Dynamisches Beschaffungssystem: Bauvergaben für das Gesamtprojekt "Maßnahmenpaket Betriebsgebäude I" und "Neubau der Straßenmeisterei Mittenwalde"
Dynamic Purchasing System for the Offsetting of the ECB's Greenhouse Gas Emissions
Germany – Solar panel roof-covering work – Installation von Photovoltaikanlagen
PRO-2511043704 - provision of services to support the ECB's independent internal investigations division
Germany – Carpentry installation work – Dynamisches Beschaffungssystem für Tischlerarbeiten für diverse Liegenschaften in Berlin

See every Germany Roads and Highways Infrastructure opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Germany Roads and Highways Infrastructure intelligence report in your inbox

A personalized report on Germany Roads and Highways Infrastructure opportunities, emailed in 5-10 minutes. One per month, no account needed.