125 m of construction fence, metal mesh, supply, provision, dismantle; 330 m of the client's construction fence, metal mesh, stored to the side, erect, dismantle; 31,500 m/week: maintain construction fence; 1 pc: set up, clear away construction power connection cabinet with transformer metering, 120 kVA; 170 pc/week: provision, maintenance, and repair of construction power connection cabinet; 1 pc: set up and clear away cable bridge over access road; 170 pc/week: provision, maintenance, and repair of cable bridge access road; 1 pc: set up and clear away construction power group distribution board, 132 kVA with 4 NH outlets; 170 pc/week: provision, maintenance, and repair of group distribution board; 1 pc: set up and clear away construction power distribution board for approx. 44 kVA; 170 pc/week: provision, maintenance, and repair of construction power distribution board; install 250 m of construction water line; 1 psch: establish connection to water supply; 3 pcs: install and dismantle construction water auxiliary connection point; 280 pcs: construction water Provide an auxiliary connection point; 3 sanitary containers (single unit), set up and cleared (400 hours per week); 1 sanitary container, set up and maintained; 1 logistics container (single unit), set up and cleared (170 hours per week); 1 logistics container (single unit), provide (143 hours per week); cleaning of on-site container system; 1 recycling center, set up, provide, and cleared (2560 hours per week); weekly cleaning service; 5 mobile waste collection points, set up, provide, and cleared (70 hours per week); 2 mobile waste collection points, emptied (120 days per week); 2 oil-fired hot air generators (100 to 150 kW) on a rental basis (120 days per week); 2 oil-fired hot air generators (200 to 250 kW) on a rental basis (120 days per week); 20 hot air hoses (diameter...) 600 mm single length 7.0 to 8.0 m on a rental basis 120 days Operation and monitoring of the aforementioned hot air generator...
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | kbo-Kinderzentrum München gemeinnützige GmbH |
|---|
| Country | Germany |
|---|
| Category | Site Preparation |
|---|
| CPV | 45113000 |
|---|
| Published | January 21, 2025 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | February 26, 2025 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Official source | View original notice |
|---|
| Last verified | October 10, 2026 |
|---|
Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.
See every Germany Site Preparation opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Germany Site Preparation intelligence report in your inbox
A personalized report on Germany Site Preparation opportunities, emailed in 5-10 minutes. One per month, no account needed.