Germany – Wood-fired power station construction work

Original title (Hungarian): Germany – Wood-fired power station construction work – Errichtung eines Altholz-Heizkraftwerks Nürnberg Gewerk Maschinentechnik GU2

N-ERGIE Aktiengesellschaft · Germany government procurement

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Active
Status

Opportunity Overview

The scope of services essentially includes the following tasks: complete detailed planning (including safety considerations and process-related risk assessment / HAZOP review), calculation, design and coding according to KKS, scheduling, delivery, assembly, operational completion, conversion work, documentation, commissioning, trial operation and training of operating personnel. Key points for the construction of the plant: - Fuel delivery by road and rail - Sampling - Oversize separation and shredding - Removal of contaminants such as ferrous and non-ferrous metals - Fuel conveyance to the storage silos and from there to the boiler's feed hopper - Exhaust air purification: receiving hall / dust filter, activated carbon filter - Waste wood boiler with grate firing and natural circulation steam generator (water-tube boiler) - Boiler house (steel construction, including facade) - Multi-stage dry flue gas cleaning with skimmer/cyclone, reactor (adsorbents: hearth furnace coke and hydrated lime (Ca(OH)2)), fabric filter and SCR process to comply with the emission limits of the 17th Federal Immission Control Ordinance (BImSchV). Unreacted adsorbents are to be partially recirculated. - Absorption heat pump for flue gas condensation and heat recovery upstream of the chimney - Discharge of the cleaned flue gas with induced draft fan via the existing chimney - Emission measurement technology integrated into the existing emissions analysis - Live steam line to the existing turbine and District heating supply - Silos for reagents, boiler ash and residual materials - Emergency power generator near the boiler house (if required) - Electrical, control, measurement and control technology including cabling, control system connection and programming into the existing T-3000 system - Slag handling (discharge and loading technology) - Pipeline construction - Steel construction

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyN-ERGIE Aktiengesellschaft
CountryGermany
CategoryElectrical Installation
CPV45251142
PublishedDecember 01, 2025
Procurement stageRequest for Proposal (RFP)
Response dueNot specified / rolling
StatusOpen — accepting responses
TranslationTranslated from Hungarian by GlobalGov’s translation pipeline
Official sourceView original notice
Last verifiedSeptember 19, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Related Opportunities in Germany

Germany – Construction work for multi-dwelling buildings and individual houses
Germany – Internet service providers ISP
Germany – Architectural, engineering and planning services
Germany – Railway tunnel construction work – 14TEI10205 2. S-Bahn-Stammstrecke München – VE 30 Rohbauarbeiten Tunnel West mit Trog und Hp HauptbahnhofBahnhofplatz
Germany – Railway tunnel construction work
Germany – Railway tunnel construction work
Germany – Railway tunnel construction work
Germany – Railway tunnel construction work

See every Germany Electrical Installation opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Germany Electrical Installation intelligence report in your inbox

A personalized report on Germany Electrical Installation opportunities, emailed in 5-10 minutes. One per month, no account needed.