Denmark – Architectural, construction, engineering and inspection services – Udbud af totalrådgivning vedr. renovering af badeværelser i AAB's afd. 23

Boligforeningen AAB · Denmark government procurement

Get new Denmark Architecture and Engineering tenders by email, free: Set up alerts

Closed November 10, 2025. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$1.6M
Est. Value
Closed
Status

Opportunity Overview

Housing association AAB's department 23 in Østerbro is to undergo an extensive renovation of the property's bathrooms. AAB's department 23 is a building from the 1920s and consists of four blocks located in outer Østerbro, of which three blocks are to be renovated. This tender only concerns total consultancy, as AAB has already entered into a contract with the general contractor, Nordstern ApS. The general consultant must enter into a collaboration with AAB and the general contractor according to the integrated construction model. The project is in period 1 of the collaboration phase, which has been extended. The general consultant must take over and complete the design from a previous consultant and conduct an investigation so that the project can move to the execution phase. This requires, among other things, that the general consultant and the general contractor can reconfirm the set target price for the project. In the execution phase, the project moves to design and execution as a turnkey contract, so that the general consultant becomes the general consultant for the general contractor. In the existing project proposal from the previous general consultant, AAB has identified a number of issues that require follow-up and quality assurance. The general consultant must therefore review and clarify a number of outstanding issues related to the project's solutions, regulatory requirements and utility companies and rectify them. Among the key outstanding issues are the following: - Statics and structures, including 1) Verification and updating of static conditions at the back staircase and 2) Static support at the front staircase and openings in load-bearing walls in the basement. - Installations (Plumbing, Ventilation, Electrical), including 1) Verification of conduits and project layout, 2) Change and update of ventilation project and 3) Placement of sprinkler system at the front staircase. - Architectural matters, including 1) Layout of bathrooms, 2) Execution of...

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyBoligforeningen AAB
CountryDenmark
CategoryArchitecture and Engineering
Estimated value$1.6M
CPV71000000
PublishedOctober 03, 2025
Procurement stageSolicitation
ClosedNovember 10, 2025
StatusClosed — no longer accepting responses
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 22, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

More Open Opportunities in Denmark

Denmark – Medical equipments – Re-supply of diabetes technology
Denmark – Electrical installation work – Framework Agreement on Electronic and Mechanical Security
Denmark – Transport services (excl. Waste transport) – Flex27 - offer of flex traffic in the North Jutland Region
Denmark – Construction work – Framework agreement on the demolition of mink production plants
Denmark – Transport services (excl. Waste transport) – Re-tender FV10 - FlexVariabel

See every Denmark Architecture and Engineering opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Denmark Architecture and Engineering intelligence report in your inbox

A personalized report on Denmark Architecture and Engineering opportunities, emailed in 5-10 minutes. One per month, no account needed.