The contracting authorities must have solar cell systems installed on supply systems in three different supply companies (Bornholms Spildevand A/S, Bornholms Vand A/S and Bornholms Varme A/S). This involves a total of 11 different solar cell systems, of which 2 will be extensions of existing systems. The solar cell systems must be installed in connection with supply systems with existing power consumption and thus connected to the existing electrical installations and grid connections. The purpose of the project is thus to cover the consumption of power on the individual cadastres. This is partly part of the contracting authority's strategy and goal of reducing the CO2 footprint. An energy meter must be installed for each system for external measurement of the system's power production. The pulse connection from the energy meter must be forwarded to the PLC module in the buildings' main switchboard. For systems over 50 kW, a production meter must be installed, cf. the Executive Order on Internal Electricity Connections. For further information on the execution of the task, please refer to Appendix 1 – Requirements Specification and Appendix 2 – Project Description. It is of great importance to the Contracting Authorities in this procurement that their code of conduct (Appendix 6), with a particular focus on human rights, is complied with in this procurement. Against this background, a documentation process has been included in section 6.3 of the tender specifications, which is intended to ensure that the Contracting Authorities have the opportunity to follow up on the fact that there has been no violation of their code of conduct before the final conclusion of the contract.
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | Bornholms Spildevand A/S |
|---|
| Country | Denmark |
|---|
| Category | Solar Energy |
|---|
| Estimated value | $449,500 |
|---|
| CPV | 09330000 |
|---|
| Published | September 12, 2025 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | October 27, 2025 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Translation | Translated from Hungarian by GlobalGov’s translation pipeline |
|---|
| Official source | View original notice |
|---|
| Last verified | September 25, 2026 |
|---|
Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.
See every Denmark Solar Energy opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Denmark Solar Energy intelligence report in your inbox
A personalized report on Denmark Solar Energy opportunities, emailed in 5-10 minutes. One per month, no account needed.