1. The subject of the Order is the execution of the following elements: Design and execution of works for the task entitled: "Construction of a structure entitled: railway line no. 622 Podłęże R401 - Gdów on section F from km 0+000 to km 17+487 together with the technical infrastructure along railway line no. 622 on the section from km 0+000 to km 17+487 and demolition, reconstruction, extension and construction of railway line no. 91 on the section from km 14+400 to km 15+200 together with the technical infrastructure along railway line no. 91 on the section from km 12+421 to km 18+498 and construction of a structure entitled: railway connection no. 627 Podłęże R301 - Podłęże Balachówka on section J from km 0+000 to km 1+928 together with the technical infrastructure along railway connection no. 627 on the section from km 0+000 to km 1+928 and demolition, reconstruction, extension and construction of railway line no. 95 on the section from km 30+750 to km 31+250 (track no. 1) and from km 31+150 to km 32+050 (track no. 2) together with technical infrastructure on the section from km 29+093 to km 33+341. z i z i The entire subject of the Order covers the execution of the following elements: 1) Design documentation, including: a) development of the detailed design (rail control and traffic control sector), b) development of as-built documentation, including as-built geodetic documentation, 2) Works in the scopes described in the OPZ and FUP: a) surface and track substructure, b) drainage and hydrotechnical works, c) external networks, d) roads, e) railway traffic control devices (rail control and traffic control), f) telecommunications devices and systems, g) traction network and power supply and control system, h) non-traction line (LPN); i) electrical power equipment and systems up to 1 kV, j) engineering structures with associated works, including a railway tunnel with connecting links, k) platforms, passenger service facilities, and enclosed structures, l)...
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | Rail Services |
|---|
| Country | Poland |
|---|
| Category | Civil Construction |
|---|
| CPV | 45000000 |
|---|
| Published | January 20, 2025 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | February 28, 2025 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Translation | Translated from Hungarian by GlobalGov’s translation pipeline |
|---|
| Official source | View original notice |
|---|
| Last verified | August 12, 2026 |
|---|
Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.
See every Poland Civil Construction opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Poland Civil Construction intelligence report in your inbox
A personalized report on Poland Civil Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.