Romania – Construction work for buildings relating to education and research – Servicii de proiectare şi execuţie de lucrări pentru obiectivul “Demolare construcție corp I (C9) și construire Centru tehnologii pentru mobilitate, campus Stiinței, str. Domnească, nr. 111” inclus în proiectului cu titlul “Crearea sustenabilă și rezilientă a CENTRULUI DE TEHNOLOGII ÎN MOBILITATE (CTM) în cadrul Universității „Dunărea de Jos” din Galați”, Cod Smis 322516

Universitatea Dunarea De Jos · Romania government procurement

Get new Romania Building Construction tenders by email, free: Set up alerts

Closed October 27, 2025. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$2.2M
Est. Value
Closed
Status

Opportunity Overview

Public procurement of Design and execution services for the objective “Demolition of building I (C9) and construction of the Mobility Technology Center, Stiinței campus, Domnească Street, no. 111” included in the project entitled “Sustainable and resilient creation of the MOBILITY TECHNOLOGY CENTER (CTM) within the “Dunărea de Jos” University of Galați”, Smis Code 322516, according to the specifications in the specifications. DURATION OF THE CONTRACT - 28 MONTHS AND 10 DAYS The duration of the design services for the development of documentation for obtaining the approvals, agreements and studies, from those requested in the Urban Planning Certificate, which have not been obtained by the date of this procedure or whose validity has expired, is max. 10 working days from the submission of the Urban Planning Certificate (if applicable). The duration of the design services for the technical documentation for obtaining the Construction and Dismantling Authorization is maximum 60 calendar days after issuing the order to start services and handing over the site for design. The duration of design services for the technical-economic documentation of the PT phase provided for in the specifications is a maximum of 60 calendar days from obtaining the Construction Permit. The duration of the works will be a maximum of 24 months from the communication of the start of the works to the Galaţi City Hall and the Galaţi State Construction Inspectorate, payment of the ISC fees of 0.1% and 0.5%, handover of the site for the execution of the works. Technical assistance from the designer will be carried out throughout the period of execution of the works until the signing of the Acceptance Report upon completion of the works by the acceptance committee without objections. In the event of an extension of the execution duration, the duration for technical assistance will also be extended without additional costs.

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyUniversitatea Dunarea De Jos
CountryRomania
CategoryBuilding Construction
Estimated value$2.2M
CPV45214000
PublishedSeptember 23, 2025
Procurement stageSolicitation
ClosedOctober 27, 2025
StatusClosed — no longer accepting responses
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 25, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in Romania

Romania – Hospital facilities construction work – Design, construction and equipment services for the Buftea Obstetrics‑Gynecology Hospital project, including demolition of existing buildings (C1‑C15), relocation of oxygen station and water utilities
Romania – Railway construction works – “Rehabilitation of the Roman - Iași - Border railway line” - Phase 1. Electrification of the Iași - Border line (design and execution)
Romania – Railway construction works – "Rehabilitation of the Roman - Iași - Border railway line" - Phase 1. Electrification of the Iași - Border line (design and execution)
Romania – Road bridge construction work – Design and Construction of a DN 24B Pipe Crossing at KM 42+092 over the Prut River, Albița‑Leușeni, Vaslui County
Romania – Construction work for school buildings – Execution of works for the realization of the objective: 'Construction of buildings with high school function, sports facilities, dormitory, canteen, conference spaces, related spaces, enclosure arrangement and fencing – Gheorghe Airinei Technical College of Post and Telecommunications', financed through the National Investment Program 'Safe and Healthy Schools'

See every Romania Building Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Romania Building Construction intelligence report in your inbox

A personalized report on Romania Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.