Lot 1 – Design, acquisition, execution, commissioning, operation and maintenance for 3 years and handover of the photovoltaic power plant SE Turceni with a minimum installed capacity of 111.68 MWp, including the 400/33 kV station. The activities that will be the subject of the contract are the Design, acquisition, execution, commissioning, operation and maintenance for three years and handover of the photovoltaic power plant on the closed ash and slag deposits belonging to SE Turceni, including the 400/33 kV station, according to the details in the Specifications (lot 1). By making these investments, it is intended to capitalize on the land areas resulting from the execution of the works to close the slag and ash deposits within the energy branches and the dumps within the mining quarries, as well as to reduce the costs associated with noxious emissions, together with the commissioning of the new production capacities. Note: Due to technical reasons related to the operation of SEAP, the system does not allow the introduction of multiple evaluation factors for the Financial Component of the Award Criterion. For correct, complete and precise information, the Contracting Entity specifies that at the award criterion level the Financial Component includes 2 evaluation sub-factors as follows: 1. Price for engineering, design, execution and commissioning of the grid-connected photovoltaic system per /MWp (euro/MWp) (weight 25%, maximum 25 points) 2. Price for the operation and maintenance of the grid-connected photovoltaic system for a period of 36 months (weight 5%, maximum 5 points) Complete details regarding the award criterion and the evaluation factors, as well as their calculation algorithm are within Section A - Instructions to bidders - Chapter II 2) Description - Award criterion. | Lot 2 - Design, acquisition, execution, commissioning, operation and maintenance for 3 years and handover of the SE Rovinari photovoltaic power plant with a minimum installed capacity...
This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.
Start FreeSource: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.
See every Romania Electrical Installation opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Your 14-Day Free TrialFree 14-day trial · cancel anytime
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Romania Electrical Installation intelligence report in your inbox
A personalized report on Romania Electrical Installation opportunities, emailed in 5-10 minutes. One per month, no account needed.