Sinesti Water Treatment Plant Rehabilitation and extension of the Sinesti water source. The works planned to be implemented within the Sinesti water intake front are of a rehabilitation, extension and modernization nature, and refer to the following objectives: Rehabilitation of existing borehole F3, replacement of pumping equipment, command, monitoring and control, rehabilitation of the drilling cabin. Re-digging of boreholes F1 and F2, including pumping equipment, command, monitoring and control, drilling cabin. Extension of the intake front, 3 (three) boreholes (F6, F7 and F8) equipped with a submersible pump each, including drilling cabins, command, monitoring and control; Rehabilitation by replacing the raw water supply pipe between the boreholes and the GA: 0.49Km Extension of the raw water supply pipe between the boreholes and the GA: 1.059Km Rehabilitation and extension of the Sinesti Water Management. The works planned to be implemented within the Sinesti water management are of a rehabilitation, extension and modernization nature, and refer to the following objectives: New storage tank: 1x300 mc Rehabilitation of existing tank: 1x200 mc New raw water treatment station Q=17.24 l/s Rehabilitation/expansion by replacing the pumping group in the Sinesti distribution network, new pumping group (2A+1R+1In); Q = 17.24 l/s, H=40mCA; New pumping group to the Movilita GA, (1A+1R); Q =8.02 l/s, H=60mCA, - Electrical and automation installations, SCADA Modernization of the Movilita water management (Movilita Treatment Station). The works planned to be implemented within the Movilita water utility are of a modernization nature and refer to the following objectives: - Installation of an electric valve on the water utility inlet pipe, for automatic regulation of the flow rate entering the tanks - Installation of an electromagnetic flow meter for measuring the raw water flow rate; - Installation of an electromagnetic flow meter for measuring the drinking water flow rate;...
This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.
Start FreeSource: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.
See every Romania Electrical Installation opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Your 14-Day Free TrialFree 14-day trial · cancel anytime
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Romania Electrical Installation intelligence report in your inbox
A personalized report on Romania Electrical Installation opportunities, emailed in 5-10 minutes. One per month, no account needed.