Romania – Parts for well-drilling machinery – Packere mecanice, Packere hidraulice, Piese de schimb pentru instalatii de interventie

Societatea Nationala de Gaze Naturale Romgaz S.A. - S.I.R.C.O.S.S. Medias · Romania government procurement

Closed October 28, 2025. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

Mechanical production packers are used in deep gas wells in order to protect the production string, allowing the flow of fluids and the passage of tools and accessories launched with a cable through its interior, without restrictions, having a constant internal diameter. Minimum quantity Framework Agreement = 7 pieces Maximum quantity Framework Agreement = 42 pieces Value of the largest subsequent contract = 495,930 lei Minimum quantity of subsequent contract = 2 pieces Maximum quantity of subsequent contract = 10 pieces Frequency of subsequent contracts: 2/year Duration of subsequent contracts: 5 months. | Hydraulic production packers are used in deviated gas wells where the use of mechanical packers is not possible, in order to protect the production string, allowing the flow of fluids and the passage of tools and accessories launched with a cable through its interior, without restrictions, having a constant internal diameter. Minimum quantity Framework agreement = 6 pieces Maximum quantity Framework agreement = 25 pieces Value of the largest subsequent contract = 386,482 lei Minimum quantity Framework agreement = 2 pieces Maximum quantity Framework agreement = 6 pieces Frequency of subsequent contracts: 2/year Duration of subsequent contracts: 5 months. | These parts contribute to the remediation of defects that occur in the intervention installations in the equipment, being extremely important in the repair process carried out by the maintenance teams. Minimum quantity Framework agreement = 63 pieces Maximum quantity Framework agreement = 2185 pieces Value of the largest subsequent contract = 299,669 lei Minimum quantity Framework agreement = 15 pieces Maximum quantity Framework agreement = 546 pieces Frequency of subsequent contracts: 2/year Duration of subsequent contracts: 5 months.

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencySocietatea Nationala de Gaze Naturale Romgaz S.A. - S.I.R.C.O.S.S. Medias
CountryRomania
CategoryProfessional Services
CPV43611000
PublishedSeptember 24, 2025
Procurement stageActive solicitation
ClosedOctober 28, 2025
StatusClosed — no longer accepting responses
Official sourceView original notice
Last verifiedOctober 06, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in Romania

Romania – Nuclear-power station construction work – Lucrări de Retehnologizare a Unității 1 CNE Cernavodă
Romania – Power converters – Componente de automatizare
Romania – Roadworks – MODERNIZARE ȘI REABILITARE A INFRASTRUCTURII STRADALE, A SISTEMULUI DE ILUMINAT PUBLIC ȘI A MOBILIERULUI URBAN ÎN MUNICIPIUL BUCUREȘTI
Romania – Construction work for highways, roads – PROIECTARE SI EXECUTIE “Autostrada Craiova – Filiasi si Drum Expres Filiasi – Targu Jiu – Lotul 4”
Romania – Construction work for highways, roads – PROIECTARE SI EXECUTIE “Autostrada Craiova – Filiasi si Drum Expres Filiasi – Targu Jiu – Lotul 4”
Romania – Construction work for gas pipelines – Execuția Conductei de transport gaze naturale Țărmul Mării Negre – Podişor (inclusiv alimentare cu energie electrică, protecție catodică și fibră optică)
Romania – Railway construction works – Proiectare și Execuție a lucrărilor aferente obiectivului de investiții ”Electrificarea și reabilitarea liniei de cale feratǎ Cluj Napoca – Oradea – Episcopia Bihor”, Lot 3 Poieni - Aleșd și Lot 4 Aleșd - Frontieră Ungaria
Romania – Hospital facilities construction work – Sediul nou pentru Spitalul de Urgență al MAI ”Prof. Dr. Dimitrie Gerota”

See every Romania Professional Services opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Romania Professional Services intelligence report in your inbox

A personalized report on Romania Professional Services opportunities, emailed in 5-10 minutes. One per month, no account needed.