DEVELOPMENT OF TECHNICAL DOCUMENTATION FOR OBTAINING THE BUILDING PERMIT (DTAC), TECHNICAL PROJECT FOR THE EXECUTION OF THE WORKS (PT), TECHNICAL ASSISTANCE FROM THE DESIGNER DURING THE PERIOD OF EXECUTION OF THE WORKS AND EXECUTION OF WORKS FOR THE INVESTMENT OBJECTIVE: LOT 1 - “MODERNIZATION OF NICOLAE BELDICEANU STREET” The types of works are those described in the design theme /specifications no. 272440 of 12.07.2024/ feasibility study, made available. A. DESIGN, of which: 1. Development of a project for authorizing the execution of the works and technical execution project: 1.1. Technical documentation for obtaining the DTAC building permit; 1.2. Technical project PT. 2. Technical assistance from the designer: 2.1. During the execution of the works; 2.2. For the participation of the designer in the phases included in the control program of the execution works, approved by the State Construction Inspectorate. B. EXECUTION, of which: 1. CONSTRUCTIONS AND INSTALLATIONS: 1.1. Roadway 1.2. Sidewalks 1.3. Accesses to properties 1.4. Consolidations 1.5. Rainwater drainage 1.6. Side roads 1.7. Auxiliary works 1.8. Road signs 2. SITE ORGANIZATION 2.1. Site organization. Total value (design + execution) of 5,280,444.17 LEI excluding VAT, according to the General Estimate of the feasibility study, prepared by the designer SOMEȘ-TOP GRUP S.R.L. is broken down as follows: a) DESIGN value: 62,700.73 LEI excluding VAT b) WORKS EXECUTION value: 5,217,743.44 LEI excluding VAT The bidders will have no obligation in relation to the values of the components, these being indicative, the offer being compared as a whole with the estimated value of the contract. The total duration of the design and execution contract will be 12 months, of which: • DESIGN: 2 months • WORKS EXECUTION: 10 months | DEVELOPMENT OF TECHNICAL DOCUMENTATION FOR OBTAINING THE BUILDING PERMIT (DTAC), TECHNICAL PROJECT FOR THE EXECUTION OF THE WORKS (PT), TECHNICAL ASSISTANCE FROM THE DESIGNER DURING THE...
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | Municipiul Oradea |
|---|
| Country | Romania |
|---|
| Category | Roads and Highways Infrastructure |
|---|
| Estimated value | $5.9M |
|---|
| CPV | 45233140 |
|---|
| Published | December 24, 2024 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | February 04, 2025 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Official source | View original notice |
|---|
| Last verified | October 10, 2026 |
|---|
Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.
See every Romania Roads and Highways Infrastructure opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Romania Roads and Highways Infrastructure intelligence report in your inbox
A personalized report on Romania Roads and Highways Infrastructure opportunities, emailed in 5-10 minutes. One per month, no account needed.