Romania – Water-treatment work – MODERNIZAREA INFRASTRUCTURII DE APĂ ȘI APĂ UZATĂ ÎN JUDEȚUL HUNEDOARA (VALEA JIULUI) - 2014-2020 – ETAPA II REABILITARE CAPTARE, ADUCȚIUNE ȘI STAȚII DE TRATARE ÎN VALEA JIULUI - LOT 1: VJ-CL-01 - REABILITARE CAPTAREA IZVORU, A STAȚIEI DE TRATARE A APEI ZĂNOAGA ȘI ADUCȚIUNEA POLATIȘTE - REST DE EXECUTAT

Apa Serv Valea Jiului S.A. · Romania government procurement

Closed January 26, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$4.9M
Est. Value
Closed
Status

Opportunity Overview

Lucrările din documentația de atribuire pentru restul lucrărilor de executat din contractul de lucrări având ca obiect REABILITARE CAPTARE, ADUCȚIUNE ȘI STAȚII DE TRATARE ÎN VALEA JIULUI (LOT 1: VJ-CL-01) - REST DE EXECUTAT cuprind finalizarea modificării fluxului tehnologic, cu reabilitarea/ dezafectarea unor obiecte existente precum și finalizarea construcțiilor de obiecte noi. Implementarea acestor măsuri implică și lucrări de reconfigurare a rețelelor de incintă, drumurilor și platformelor existente în amplasamentul stației de tratare. Procesul tehnologic al stației de tratare Zănoaga: • Linia apei – Finalizare obiecte noi și reabilitare/reconfigurare/conversie obiecte existente  Finalizare realizare complex nou pentru camere coagulare-floculare și decantoare cu modul lamelar și concentratoare de nămol  Finalizare Reabilitare pavilion administrativ și stație de filtrare rapidă pe nisip, cu reconfigurare pentru jumătate din cuvele de filtrare existente, inclusiv reconfigurare instalație hidraulică aferentă și reabilitare echipamente de spălare cu apă și aer  Finalizare realizare stație nouă de pompare intermediară  Finalizare realizare treaptă nouă de post-oxidare cu ozon, inclusiv depozit de oxigen, generator de ozon și destructor de ozon  Finalizare conversie pentru jumătate din cuvele existente de filtrare rapidă pe nisip în filtre de cărbune activ granular, inclusiv reconfigurare instalație hidraulică aferentă  Finalizare reabilitare și reconfigurare compartiment existent în clădirea administrativă pentru stocare coagulant  Finalizare realizare clădire nouă, inclusiv echipamente și instalații pentru stocare-preparare-dozare reactiv de remineralizare a apei filtrate  Finalizare reabilitare compartiment existent în clădirea administrativă prevăzut cu echipamente/instalații noi de stocare-preparare-dozare clor gazos și introducere echipamente și instalații noi de preparare-dozare dioxid de clor • Linia nămolului - Finalizare obiecte noi  Finalizare...

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyApa Serv Valea Jiului S.A.
CountryRomania
CategoryRoads and Highways Infrastructure
Estimated value$4.9M
CPV45232430
PublishedNovember 14, 2025
Procurement stageActive solicitation
ClosedJanuary 26, 2026
StatusClosed — no longer accepting responses
Official sourceView original notice
Last verifiedOctober 06, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in Romania

Romania – Nuclear-power station construction work – Lucrări de Retehnologizare a Unității 1 CNE Cernavodă
Romania – Power converters – Componente de automatizare
Romania – Roadworks – MODERNIZARE ȘI REABILITARE A INFRASTRUCTURII STRADALE, A SISTEMULUI DE ILUMINAT PUBLIC ȘI A MOBILIERULUI URBAN ÎN MUNICIPIUL BUCUREȘTI
Romania – Construction work for highways, roads – PROIECTARE SI EXECUTIE “Autostrada Craiova – Filiasi si Drum Expres Filiasi – Targu Jiu – Lotul 4”
Romania – Construction work for highways, roads – PROIECTARE SI EXECUTIE “Autostrada Craiova – Filiasi si Drum Expres Filiasi – Targu Jiu – Lotul 4”
Romania – Construction work for gas pipelines – Execuția Conductei de transport gaze naturale Țărmul Mării Negre – Podişor (inclusiv alimentare cu energie electrică, protecție catodică și fibră optică)
Romania – Railway construction works – Proiectare și Execuție a lucrărilor aferente obiectivului de investiții ”Electrificarea și reabilitarea liniei de cale feratǎ Cluj Napoca – Oradea – Episcopia Bihor”, Lot 3 Poieni - Aleșd și Lot 4 Aleșd - Frontieră Ungaria
Romania – Hospital facilities construction work – Sediul nou pentru Spitalul de Urgență al MAI ”Prof. Dr. Dimitrie Gerota”

See every Romania Roads and Highways Infrastructure opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Romania Roads and Highways Infrastructure intelligence report in your inbox

A personalized report on Romania Roads and Highways Infrastructure opportunities, emailed in 5-10 minutes. One per month, no account needed.