Slovakia – Construction work – Diaľnica D3 Žilina, Brodno – Kysucké Nové Mesto

International buyer · Slovakia government procurement

Closed February 25, 2025. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$548.0M
Est. Value
Closed
Status

Opportunity Overview

The subject of the contract is the construction of the D3 motorway in the section Žilina (Brodno) - Kysucké Nové Mesto, which is part of the D3 motorway, which starts in Hričovské Podhradí and ends at the border with Poland in Skalité. It is part of the D1 - D3 motorway section on the Bratislava - Trenčín - Žilina - Skalité route. The motorway in question is also part of the Multimodal Transport Corridor No. VI, the Trans-European Networks and the Trans-European Motorway in the north-south direction. The construction of the D3 motorway in the targeted area will increase the capacity of the road network in the region, reduce the negative impacts of passenger but especially freight car traffic and increase traffic safety. The targeted section starts at km 11.100 of the D3 motorway in the area of the Brodno interchange and continues with the previous section of the D3 motorway Žilina (Strážov) - Žilina (Brodno). The end of the planned section is at km 22.300 of the D3 motorway, where the motorway continues with the Kysucké Nové Mesto – Oščadnica section. The motorway is designed throughout as a four-lane, directionally divided road in the D24.5/80 category, which is also reflected in all technical parameters (directional and elevation of the route). The D3 motorway also includes branches of the Kysucké Nové Mesto interchange. The construction also involves the relocation of road I/11 in the section from the Brodno interchange to the reconnection of the relocation to road I/11 in the Kysucké Brána area. The route of the relocation is led from the unfinished Brodno Intersection, which it completes into a full-fledged intersection, continues by crossing the Žilina - Čadca railway line via an overpass, then runs parallel to the railway line through the local part of Žilina - Brodno and at the Brodno railway stop it begins to deviate from the ŽSR line and connects to the existing road I/11. Along the route, it crosses Brodňanská Street via an overpass without connecting to...

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyInternational buyer
CountrySlovakia
CategoryCivil Construction
Estimated value$548.0M
CPV45000000
PublishedNovember 26, 2024
Procurement stageActive solicitation
ClosedFebruary 25, 2025
StatusClosed — no longer accepting responses
Official sourceView original notice
Last verifiedOctober 08, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in Slovakia

Slovakia – Data-processing machines (hardware) – Digitálna transformácia a modernizácia IKT infraštruktúry a IT systémov DCVaV CVTI SR
Slovakia – Construction work – D1 Turany - Hubová, stavebné práce
Slovakia – Construction work – NÁRODNÁ NEMOCNICA GENERÁLA MILANA RASTISLAVA ŠTEFÁNIKA
Slovakia – Construction work – NÁRODNÁ NEMOCNICA GENERÁLA MILANA RASTISLAVA ŠTEFÁNIKA
Slovakia – Miscellaneous business-related services – Razba, distribúcia a predaj investičných zberateľských euromincí „BIATEC“
Slovakia – Refuse collection services – Nakladanie s komunálnymi odpadmi a drobnými stavebnými odpadmi na území mesta Košice
Slovakia – Construction work – R2 Šaca – Košické Oľšany, I. úsek
Slovakia – Public road transport services – Poskytovanie služieb regionálnej autobusovej dopravy vo verejnom záujme na území dopravného regiónu Dunajská Streda

See every Slovakia Civil Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Slovakia Civil Construction intelligence report in your inbox

A personalized report on Slovakia Civil Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.