Design, Supply and Installation of the Solar Power Plant (SPP) Project for Yeşilyurt Municipality, Malatya

World Bank -- Sustainable Cities Project 2 · Turkiye government procurement

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

September 08, 2026
Response Due
Active
Status

Opportunity Overview

HALEYE DAVET   SÜRDÜRÜLEBLR EHRLER PROJES II – EK FNANSMAN   YELYURT BELEDYES   MALATYA YELYURT BELEDYES GÜNE ENERJS SANTRAL (GES) PROJES TASARIMI, TEDARK VE KURULUMU SÖZLEME NO. YESILYURT-W1_2   Ülke : Türkiye Proje Ad : Sürdürülebilir ehirler Projesi II – Ek Finansman Sözleme Bal : MALATYA YELYURT BELEDYES GÜNE ENERJS SANTRAL (GES) PROJES TASARIMI, TEDARK VE KURULUMU Kredi No . P170612   RFB Referans No. YESILYURT-W1_2   bu hale lan, Development Business'in dijital saysnda 14 Mart 2018 tarihinde yaymlanan WB2479-03/18 referans no’lu Genel Satnalma Bildirimini (GPN) takiben yaymlanmaktadr.   ller Bankas A.. (bundan sonra "Kredi Salayc veya Ana Uygulayc veya LBANK" olarak anlacaktr), Dünya Bankas’ndan (IBRD) (bundan sonra "Ana Kreditör veya Banka veya IBRD" olarak anlacaktr) Sürdürülebilir ehirler Projesi II-Ek Finansman (P170612) (bundan sonra “SCP2-AF” olarak anlacaktr)- kapsamnda kullanlmak üzere kredi temin etmitir. ller Bankas A.. kredinin bir ksmn Yeilyurt Belediyesi (bundan sonra veren veya Yeilyurt Belediyesi olarak anlacaktr) MALATYA Yeilyurt Belediyesi Güne Enerjisi Santrali (GES) Projesi Tasarm, Tedariki ve Kurulumu (Sözleme No: YESILYURT- W1_2)” iinin finansman için tahsis etmitir. MALATYA Yeilyurt Belediyesi, MALATYA Yeilyurt Belediyesi Güne Enerjisi Santrali (GES) Projesi Tasarm, Tedariki ve Kurulumu i için Dünya Bankas satn alma esas ve usulleri dorultusunda, uygun teklif sahiplerini kapal zarf usulü teklif vermeye davet etmektedir. in kapsam; MALATYA Yeilyurt Belediyesi Güne Enerjisi Santrali (GES) Projesi Tasarm, Tedariki ve Kurulumu (990 kWe AC / 1.177,2 kWp DC kurulu güce sahip) Sözleme süresi, Kusur Sorumluluk Süresi hariç olmak üzere 152 (yüzelliiki) takvim...

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyWorld Bank -- Sustainable Cities Project 2
CountryTurkiye
CategoryEnergy
PublishedAugust 05, 2026
Procurement stageRequest for Proposal (RFP)
Response dueSeptember 08, 2026
StatusOpen — accepting responses
Official sourceView original notice
Last verifiedAugust 12, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

Related Opportunities in Turkiye

Construction and Electrification Works for INRAIL (4 Lots)
Consultancy Services for Procurement of Software Development, Update, and Maintenance Support Services for the Infectious Disease Surveillance and Early Warning System (İzci) Web and Mobile Application
Financial Management Specialist
Procurement Specialist
Procurement Specialist
Consultancy Services Procurement for Activities to be Supported within the Scope of Establishing Shared Machinery Parks
Procurement Specialist
Technical Asistance in Implementation of Emissions Trading System ( Lump Sum) Support for Implementation of TR ETS (Time-based)

See every Turkiye Energy opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Turkiye Energy intelligence report in your inbox

A personalized report on Turkiye Energy opportunities, emailed in 5-10 minutes. One per month, no account needed.