Design, Supply and Installation of the Solar Power Plant (SPP) Project for Yeşilyurt Municipality, Malatya

World Bank -- Sustainable Cities Project 2 · Turkiye government procurement

Bidding on World Bank-funded work in Turkiye? Get new Energy tenders there by email, free: Set up alerts

Closed September 08, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

HALEYE DAVET

SÜRDÜRÜLEBLR EHRLER PROJES II – EK FNANSMAN

YELYURT BELEDYES

MALATYA YELYURT BELEDYES GÜNE ENERJS SANTRAL (GES) PROJES TASARIMI, TEDARK VE KURULUMU

SÖZLEME NO. YESILYURT-W1_2

Ülke: Türkiye

Proje Ad: Sürdürülebilir ehirler Projesi II – Ek Finansman

Sözleme Bal: MALATYA YELYURT BELEDYES GÜNE ENERJS SANTRAL (GES) PROJES TASARIMI, TEDARK VE KURULUMU

Kredi No. P170612

RFB Referans No. YESILYURT-W1_2

• bu hale lan, Development Business'in dijital saysnda 14 Mart 2018 tarihinde yaymlanan WB2479-03/18 referans no’lu Genel Satnalma Bildirimini (GPN) takiben yaymlanmaktadr.

• ller Bankas A.. (bundan sonra "Kredi Salayc veya Ana Uygulayc veya LBANK" olarak anlacaktr), Dünya Bankas’ndan (IBRD) (bundan sonra "Ana Kreditör veya Banka veya IBRD" olarak anlacaktr) Sürdürülebilir ehirler Projesi II-Ek Finansman (P170612) (bundan sonra “SCP2-AF” olarak anlacaktr)- kapsamnda kullanlmak üzere kredi temin etmitir. ller Bankas A.. kredinin bir ksmn Yeilyurt Belediyesi (bundan sonra veren veya Yeilyurt Belediyesi olarak anlacaktr) MALATYA Yeilyurt Belediyesi Güne Enerjisi Santrali (GES) Projesi Tasarm, Tedariki ve Kurulumu (Sözleme No: YESILYURT- W1_2)” iinin finansman için tahsis etmitir.
• MALATYA Yeilyurt Belediyesi, MALATYA Yeilyurt Belediyesi Güne Enerjisi Santrali (GES) Projesi Tasarm, Tedariki ve Kurulumu i için Dünya Bankas satn alma esas ve usulleri dorultusunda, uygun teklif sahiplerini kapal zarf usulü teklif vermeye davet etmektedir.

in kapsam; MALATYA Yeilyurt Belediyesi Güne Enerjisi Santrali (GES) Projesi Tasarm, Tedariki ve Kurulumu (990 kWe AC / 1.177,2 kWp DC kurulu güce sahip) Sözleme süresi, Kusur Sorumluluk Süresi hariç olmak üzere 152 (yüzelliiki) takvim günüdür. Kusur Sorumluluk süresi 365 (üçyüzaltmbe) gündür.

• hale, Dünya Bankas’nn “Yatrm Projeleri (IPF) Borçlular tarafndan uygulanacak Satnalma Kurallarna (Kasm 2020 revizyonu) uygun olacak ekilde Teklife Çar (RfB) yaplarak ulusal rekabetçi ihale yöntemiyle gerçekletirilecek olup, Satn...

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyWorld Bank -- Sustainable Cities Project 2
CountryTurkiye
CategoryEnergy
PublishedAugust 05, 2026
Procurement stageRequest for Proposal (RFP)
ClosedSeptember 08, 2026
StatusClosed — no longer accepting responses
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 22, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

More Open Opportunities in Turkiye

154 kV Antalya – Göksu Underground Cable Connection
Consultancy Services for Construction Supervision Services for Ege Neighborhood Interchange Bridge Project
Procurement of Digital Radio Communication System
Procurement of Eye Outpatient Clinic System
TÜRKİYE FLOOD AND DROUGHT MANAGEMENT PROJECT - FLOOD FORECASTING AND EARLY WARNING SYSTEM IN 6 RIVER BASINS (Marmara, Yeşilırmak, Sakarya, Batı Akdeniz, Akarçay, Burdur)

See every Turkiye Energy opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Turkiye Energy intelligence report in your inbox

A personalized report on Turkiye Energy opportunities, emailed in 5-10 minutes. One per month, no account needed.