The objective of the Trans-Hindukush Road Connectivity Project for Afghanistan is to improve road transport connectivity across the Hindukush mountain range. There are two components to the project, the first component being Road construction and rehabilitation. This component will include: (i) civil works for the construction of the Baghlan to Bamiyan (B2B) road and the rehabilitation of the Salang road and tunnel, (ii) consulting services, including for the supervision of civil works and for regular technical audits by an independent international auditor to verify that road works have been executed in compliance with the technical specifications, and (iii) goods, which will include a small number of equipment items which MPW may need to keep the two roads open during the project period. The finalized technical design of the B2B road will include cable ducts and fiber optic cables. Technical specifications for the civil works will include labor intensive choices wherever feasible, such as masonry parapets instead of steel guardrails, and masonry retaining walls. It is estimated that within the total cost of Component, about US$ 170 million will be spent on the Baghlan to Bamiyan road, US$ 55 million will be spent on the Salang road and tunnel, while the remainder of US$ 15 million will be spent on goods and services benefitting both roads. The second component is the institutional support and project management. This component will be comprised of several subcomponents: definition and implementation of asset management arrangements for the trans-Hindukush roads, road safety, community engagement, training, capacity building and institutional development, and project management support.
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | World Bank – IBRD |
|---|
| Country | Islamic Republic of Afghanistan |
|---|
| Category | Roads and Highways Infrastructure |
|---|
| Published | October 20, 2015 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | October 20, 2015 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Official source | View original notice |
|---|
| Last verified | August 12, 2026 |
|---|
Source: The World Bank — Open Data, licensed CC BY 4.0.
Construction and Rehabilitation of WASH facilities (Water well, Solar System, Water tank, Flush latrine, septic tank, Handwashing facility, MHM room, Incinerator, ashpit, sharp pit and placenta) in 31 HCF in Helmand, Zabul, Kandahar and Urozgan Provinces. See every Islamic Republic of Afghanistan Roads and Highways Infrastructure opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Islamic Republic of Afghanistan Roads and Highways Infrastructure intelligence report in your inbox
A personalized report on Islamic Republic of Afghanistan Roads and Highways Infrastructure opportunities, emailed in 5-10 minutes. One per month, no account needed.