TZ-Rural Electrification Expansion Program

World Bank – IBRD · United Republic of Tanzania government procurement

Closed June 21, 2016. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

The development objectives of Rural Electrification Expansion Project for Tanzania are: (a) to increase access to electricity in rural areas; and (b) to scale-up the supply of renewable energy in rural areas while strengthening sector institutional capacity. The Rural Energy Agency (REA) and the private sector are implementing the National Rural Electrification Program (NREP), the government program, during 2013–2022, as outlined in the Prospectus. The Government of Tanzania (GoT) plans to achieve about 1.3 million connections in rural areas (including public facilities), increasing the average access rate to electricity (both urban and rural) from the current 24 percent to 35 percent by 2022. This Program-for-Results (PforR) aims to support three of the electrification avenues of the NREP identified in the Prospectus: (i) grid extension; (ii) off-grid electrification; and (iii) within the category of offgrid electrification, renewable technologies, including solar photovoltaic (PV). This program is strategically relevant and fully aligned with TDV 2025. This PforR will support the government in implementing the NREP based on these existing plans and will support the targets to be determined in the more detailed Master Plan, as the government adopts and implements it over time. It supports a subset of the NREP, consisting of a time slice of the grid investments outlined in the Prospectus (2016–2022) and the off-grid investments and distributed technologies by the private sector, implemented by the REA. In addition, PforR will support the joint efforts of the GoT and Development Partners (DPs) in strengthening the capacity of the relevant sector institutions. Considering the level of available financing from the DPs, combined with the low level of private sector participation in relation to the investment needs outlined in the Prospectus, public sector financing is crucial for expanding electricity access and improving sector performance in areas that will be...

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyWorld Bank – IBRD
CountryUnited Republic of Tanzania
CategoryConstruction
PublishedJune 21, 2016
Procurement stageActive solicitation
ClosedJune 21, 2016
StatusClosed — no longer accepting responses
Official sourceView original notice
Last verifiedAugust 12, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

Browse Similar Open Opportunities in United Republic of Tanzania

Consultancy Services for Capacity Building on Service Delivery and Operations and Maintenance in Selected LGAs and PMO-RALG under the TACTIC Project
Consultancy Services to Undertake an Environmental and Social Impact Assessment and Resettlement Action Plan for Flood and Erosion Control Interventions in the Middle and Upper Basin of the Msimbazi River in Dar es Salaam
Consultancy Services to Conduct a Study on Own-Source Revenue Allocation Between Lower Level Governments (LLGs) and Local Government Authorities and Development of the LLGs' Own-Source Revenue Administration Guidelines under the TACTIC Project
Consultancy Services for Preparation of ESIAs and RAPs for Area-Based Investments in Dar es Salaam City, Kinondoni, Ubungo, Temeke & Kigamboni Municipalities, and Priority Drainage Interventions in Dar es Salaam under DMDP 2
Supply, Installation, Implementation, Testing and Commissioning of Hardware (UPS, Backup and Disaster Recovery) Equipment for Implementation of Integrated District Roads Management Information System (DROMAS)
Supply, Installation, Implementation, Testing and Commissioning of Hardware (Servers, Storage, switches, and LCD KVM Console) Equipment for Implementation of Integrated District Roads Management Information System (DROMAS)
Supply, Installation, Implementation, Testing and Commissioning of Hardware (Firewall, Switching, Wireless and Network Modernization) Equipment for Implementation of Integrated District Roads Management Information System (DROMAS)
Supply, Installation, Implementation, Testing and Commissioning of Hardware (Desktop, laptops and Tablets) Equipment for Implementation of Integrated District Roads Management Information System (DROMAS)

See every United Republic of Tanzania Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free United Republic of Tanzania Construction intelligence report in your inbox

A personalized report on United Republic of Tanzania Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.