The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34�4 out-to-out, with two 11�0� travel lanes, two 2�0� shoulders, a 5�0� sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.
This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.
Start Free| Issuing agency | Dept of Defense |
|---|
| Country | United States |
|---|
| Category | Road & Infrastructure |
|---|
| NAICS | 237310 - Highway, Street, and Bridge Construction |
|---|
| PSC | Y1LB |
|---|
| Published | August 19, 2026 |
|---|
| Procurement stage | Solicitation |
|---|
| Closed | September 18, 2026 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Official source | View original notice · Get alerts for tenders like this |
|---|
| Last verified | November 27, 2026 |
|---|
Source: U.S. Government (SAM.gov) — public domain. GlobalGov is not affiliated with or endorsed by the United States Government.
See every United States Road & Infrastructure opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Your 14-Day Free TrialFree 14-day trial · cancel anytime
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free United States Road & Infrastructure intelligence report in your inbox
A personalized report on United States Road & Infrastructure opportunities, emailed in 5-10 minutes. One per month, no account needed.