Ca - Fws Modoc Nwr- Mesuring Weir Replcmt

FWS Construction & A/E - BIL/Disaster · United States government procurement

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

August 28, 2026
Response Due
Active
Status

Opportunity Overview

This is a combined synopsis/solicitation for a construction requirement prepared in accordance with the Federal Acquisition Regulation (FAR), including FAR Part 13, Simplified Acquisition Procedures, and FAR Part 36, Construction and Architect-Engineer Contracts, as applicable. This announcement constitutes a solicitation; offers are being requested in accordance with the terms, conditions, specifications, and attachments included in this notice. A separate written solicitation will not be issued.U.S. Fish and Wildlife Service, Modoc National Wildlife Refuge ¿ Alturas, California design and construct requirement for a durable, safe, and structurally sound in-canal concrete water control structure that meets all regulatory standards. The structural integrity and safety shall ensure the in-canal structure is built to support the expected load capacities, tractor trailer and pedestrian traffic. The in-canal shall adhere to applicable safety standards and codes to mitigate risks during construction and throughout the operational life of the structure. The functionality and accessibility must provide a seamless connection between the specified locations to enhance efficiency and administrative access. Sustainability and environmental considerations should minimize environmental impact through the uses of sustainable materials and construction practices. Implement measures to protect nearby ecosystems and waterways during construction and operation. The compliance and quality assurance shall follow all local, state, and federal regulations governing construction activities.The construction magnitude is estimated to be between $50,000.00 to $60,000.00. 100% performance bonds and payment bonds will be requiredThe office is located:USFWS - Modoc National Wildlife Refuge (MNWR)5364 County Road 115Alturas, California 96101Performance Period and Completion:The Period of Performance shall be 62 calendar days and will commence upon issuance of the Notice to Proceed (NTP). The...

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyFWS Construction & A/E - BIL/Disaster
CountryUnited States
CategoryGovernment Procurement
NAICS237310
PSCZ2LB
PublishedJuly 24, 2026
Procurement stageRequest for Proposal (RFP)
Response dueAugust 28, 2026
StatusOpen — accepting responses
Official sourceView original notice
Last verifiedAugust 10, 2026

Source: U.S. Government (SAM.gov) — public domain. GlobalGov is not affiliated with or endorsed by the United States Government.

Related Opportunities in United States

CA-MERCED NWR-Solar Distribution Panel Replacement
PR-VIEQUES NWR-PRIORITY RDS CONSTRUCTION
WA-MAKAH NFH-SEPTIC SYSTEM REPLACEMENT
Carson National Fish Hatchery Quarters 4 Interior
NM-REFUGE OPERATIONS-WEED WASH STATION
Multiple Award Schedule
Multiple Award Schedule
PPVG GEN V Award

See every United States Government Procurement opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free United States Government Procurement intelligence report in your inbox

A personalized report on United States Government Procurement opportunities, emailed in 5-10 minutes. One per month, no account needed.