Dashields Locks and Dam Hydraulic System Upgrade

W072 Endist Pittsburgh · United States government procurement

Closed August 20, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

Dashields Locks and Dam Install 4 Corner Hydraulics Dashields Locks and Dam, Coraopolis, PennsylvaniaThe Dashields hydraulic system upgrade consists of demolition and removal of the existing hydraulic system and its related components, and installation of a new hydraulic system with supporting controls and buildings.Primary hydraulic system components to be demolished and removed are motors, pumps, reservoir, filters, filter housings, piping and pipe hangers, hydraulic fluid, valves, and manifolds. Any hydraulic piping that is embedded in concrete must be drained, cut flush with the concrete surface, capped or plugged, and abandoned in place. Nine (9) new hydraulic cylinders must be furnished by the contractor and five (5) will be furnished by the government. Electrical demolition work must include but not be limited to removal of specified buckets, cabinet doors, junction boxes, levers, buttons, indicators, limit switches, wiring, and hardware. Some concrete demolition work must be required for placement of new buildings and routing of new electrical cable and mechanical pipe.Three (3) new hydraulic power units (HPUs) must be furnished and installed on the land and middle lock walls inside two new 2-story HPU buildings at locations specified on the contract drawings. The fourth HPU will be furnished and installed on an elevated platform in the river wall at the location specified in the contract drawings. The HPU buildings and elevated platform must be designed and constructed by the contractor in accordance with the performance specification and the concept drawings included in the contract drawings. The HPUs must send hydraulic power to the existing hydraulic cylinders by means of new stainless-steel piping and new manifold mounted hydraulic components.The new hydraulic equipment must be operated by new electronic controls that will be installed inside new panels and new control consoles. The new control panels must be installed on each HPU with an additional...

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyW072 Endist Pittsburgh
CountryUnited States
CategoryGovernment Procurement
NAICS237990
PSCZ2KA
PublishedAugust 13, 2026
Procurement stageActive solicitation
ClosedAugust 20, 2026
StatusClosed — no longer accepting responses
Official sourceView original notice
Last verifiedOctober 11, 2026

Source: U.S. Government (SAM.gov) — public domain. GlobalGov is not affiliated with or endorsed by the United States Government.

Browse Similar Open Opportunities in United States

Septic Tanks Pumping Service - Hannibal Locks and Dam
Borough of Etna, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
JP Martha Float Mooring Bitts Retrofit
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
JP Murtha Float Mooring Bitts Retrofit
Multiple Award Schedule
Multiple Award Schedule
PPVG GEN V Award

See every United States Government Procurement opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free United States Government Procurement intelligence report in your inbox

A personalized report on United States Government Procurement opportunities, emailed in 5-10 minutes. One per month, no account needed.