Electrical Rebuild, Black Rock Lake Dam, Thomaston, Connecticut

W2SD Endist New England · United States government procurement

Get new United States tenders by email, free: Set up alerts

Closed September 04, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

The U.S. Army Corps of Engineers, New England District is solicitating an Invitation for Bids (IFB) for Electrical Feeder Upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. This will be a 100% Small Business Set-Aside IFB procurement. The NAICS code for the work described below is 238210 with a size standard of $19M. The project is planned to be issued in July 2026 and will be set aside for Small Businesses. The period of performance will be approximately 180 days. The estimated magnitude of this project is between $750,000 and $1,250,000.The work of this project involves electrical feeder upgrades at the Black Rock Lake Dam in Thomaston, Connecticut. Specific work tasks include, but are not limited to, replacing the existing overhead dam feeder (which runs underneath a high voltage line) from the project office to a designated manhole with a buried conduit duct bank.The existing gate tower feeder is in an existing buried duct bank which runs up the dam face and in exposed conduit beneath the gate tower bridge will be removed and replaced with new. The fused disconnect at the existing overhead line end will be removed. The existing manual transfer switches in the gate tower and project office will be removed. The existing 480V Panel-A, transformer, and 120/208 Panel-B in the gate tower will be removed and replaced with new. The existing service entrance circuit breaker and its enclosure will remain and be reused. Install new propane genset in the project office parking lot. Install a new propane tank with an underground propane line connected to the genset. The new genset will be sized to power both the project office and the gate tower on loss of utility. The propane tank will be sized to provide 5 days of run time before needing to be refilled. Install a new properly sized automatic transfer switch to feed existing panel MDP-1 from either the existing utility feeder or the new propane genset.

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyW2SD Endist New England
CountryUnited States
CategoryGovernment Procurement
NAICS238210 - Electrical Contractors and Other Wiring Installation Contractors
PSCY1QA
PublishedAugust 21, 2026
Procurement stageSolicitation
ClosedSeptember 04, 2026
StatusClosed — no longer accepting responses
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 24, 2026

Source: U.S. Government (SAM.gov) — public domain. GlobalGov is not affiliated with or endorsed by the United States Government.

Browse Similar Open Opportunities in United States

Electrical Installation of 5-Station Cubicle and One Single Hotel Desk Arrangement
Modernize Regenerative Thermal Oxidizer (RTO)
Installation of Proximity Sensors for Automatic Doors
Electrical Wiring Install
Remove and Repair Two High Velocity Air Handling Units

See every United States opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free United States Government Procurement intelligence report in your inbox

A personalized report on United States Government Procurement opportunities, emailed in 5-10 minutes. One per month, no account needed.