FY26 NRM -Medical Gas Deficiency 610A4-26-507 (VA-26-00058207)

250-Network Contract Office 10 (36C250) · United States government procurement

Get new United States Energy tenders by email, free: Set up alerts

Closed August 14, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

SCOPE A recent medical gas evaluation identified deficiencies on the 3rd Floor. The Contractor shall correct all cited items and ensure all O (OXYGEN), MA (COMPRESS MEDICAL AIR), VAC (MEDICAL VACUUM), WAGD (Waste Anesthetic Gas Disposal), N (Nitrogen), N O (Nitrous Oxide), valves, alarms, and infrastructure are fully code compliant and fully operational. Code Compliance Requirements All work shall be performed in accordance with NFPA 99, 2018 Edition. Any location where N O or halogenated anesthetic agents may be administered - including CT, X-ray, and imaging rooms using roll in anesthesia machines - shall be equipped with dedicated WAGD inlets. Rooms receiving WAGD shall be treated as anesthetizing locations. Contractor shall provide: A dedicated zone valve assembly per NFPA 99 Section 5.1.4.6.2. Area alarm coverage meeting NFPA 99 requirements. INFECTION CONTROL RISK ASSESSMENT (ICRA) Contractor shall coordinate with Infection Prevention and Control and complete an ICRA before work begins. ICRA measures may include barriers, negative air, HEPA filtration, dust containment, restricted work hours, cleaning protocols, and traffic controls. Contractor must implement and maintain all ICRA requirements for the project duration and promptly correct any deficiencies identified by Infection Control, Safety, or the COR. Phasing and Shutdown Requirements Submit a phasing and shutdown plan at least 14 working days prior to any interruption. No room may begin until the previous room is fully commissioned. Each Room Must Follow These Phases: Pre Construction Coordination ICRA Containment Setup Selective Ceiling Demolition & Rough In Gas Shutdowns & Tie Ins. Follow NFPA 99 procedures for tie ins, including depressurization, blow down, leak testing, and post connection re verification. Installation personnel must be credentialed: ASSE 6010 medical gas installers. Brazers qualified per ASME BPVC Section IX / AWS B2.2. Device Installation Ceiling Restoration (hard ceiling rooms...

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agency250-Network Contract Office 10 (36C250)
CountryUnited States
CategoryEnergy
NAICS238220 - Plumbing, Heating, and Air-Conditioning Contractors
PSCJ047
PublishedJune 11, 2026
Procurement stageSolicitation
ClosedAugust 14, 2026
StatusClosed — no longer accepting responses
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 26, 2026

Source: U.S. Government (SAM.gov) — public domain. GlobalGov is not affiliated with or endorsed by the United States Government.

Browse Similar Open Opportunities in United States

DLA Energy – Bulk Petroleum Products
IDIQ JOC Plumbing Systems and Pipe and Gas Fitting for 29 Palms
Clarks River NWR 10-Year Bulk Fuel BPA
13976 PUHO Fire Protection at Dorm
Pneumatic Tube System Preventive Maintenance

See every United States Energy opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free United States Energy intelligence report in your inbox

A personalized report on United States Energy opportunities, emailed in 5-10 minutes. One per month, no account needed.