This technology platform from Los Alamos National Laboratory enables more reliable high-temperature heat pipe reactors by improving the way critical wick structures are manufactured and how heat pipe arrays are filled, sealed, and checked for quality. A stronger wick gives the system the capillary action needed to move liquid metal through the pipe under demanding thermal conditions, while the fill platform helps prepare clean, repeatable assemblies that are better suited for reactor-grade use. For organizations working in nuclear, space, or other high-heat environments, the Heat Pipe Reactor Wick and Fill Platform offers a more practical route to building durable thermal hardware with fewer manufacturing bottlenecks. How it Works The Heat Pipe Reactor Wick and Fill Platform begins with wick fabrication, where a fine mesh or similar material is shaped around a mandrel and compressed so the layers can be bonded into a strong porous tube. Depending on the version, the wick can be formed by drawing, hydroforming, or other controlled shaping methods before diffusion bonding locks the structure in place. After bonding, the temporary mandrel and sheath are removed by etching, leaving a porous wick with the pore structure and geometry needed for high-temperature alkali metal heat pipes. The fill process is designed to load, seal, and inspect heat pipe arrays under controlled atmosphere conditions, often using vacuum or inert gas environments. That workflow can be automated with precision metering, controlled handling, and laser welding, which helps improve repeatability and reduce contamination risk. Quality control can be built into both the wick and fill steps through inspection of the porous structure, leak testing, fill verification, and process monitoring, all of which support more consistent reactor-scale production. Technical Description The wick fabrication methods focus on producing a porous annular structure with the strength and capillary performance required...
How to bid: GlobalGov tracks this tender; it does not accept bids. Submit your response through the issuing agency’s official notice.
Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start a free GlobalGov account| Issuing agency | Triad - DoE Contractor |
|---|
| Country | United States |
|---|
| Category | Government Procurement |
|---|
| NAICS | 333415 |
|---|
| PSC | 4540 |
|---|
| Published | June 04, 2026 |
|---|
| Procurement stage | Request for Proposal (RFP) |
|---|
| Response due | December 03, 2026 |
|---|
| Status | Open — accepting responses |
|---|
| Official source | View original notice |
|---|
| Last verified | October 11, 2026 |
|---|
Source: U.S. Government (SAM.gov) — public domain. GlobalGov is not affiliated with or endorsed by the United States Government.
See every United States Government Procurement opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free United States Government Procurement intelligence report in your inbox
A personalized report on United States Government Procurement opportunities, emailed in 5-10 minutes. One per month, no account needed.