36C24226R0060 Amendment 3 630A4-26-401 MRI AHU Modification 6. Per our teams meeting this morning, please see below RFI's; There are 3 potential options for the MRI chiller: Air cooled package at grade with glycol and pump package. Air cooled package at grade using glycol but also using a plate and frame heat exchanger to separate the glycol from the clear water. Air cooled split chiller with outdoor condenser and indoor evaporator using clear water only. Does The VA have a preference for which system works better for them? The scope of work calls for an inline pump to serve the fan coil units. Can the VA share the reason for these extra pumps as series pumping can present issues. If the additional head is included in the new chiller pumps does that suffice? There are 6 new fan coil units called for in the corridor. This is 9 tons of cooling. Does the corridor have that kind of a load? Typically, corridors are only lighting and a few transient people. Also, if 9 tons is used for fan coil units, is 21 tons sufficient for the MRI Load? COR answer(s): It appears that Option 2 may be the more effective choice; however, as this is a design-build project, we rely on the A/E team s expertise to design the system in accordance with VA requirements and specifications. Accordingly, a series pump configuration is not considered an acceptable design. The A/E team should perform its own heat load calculation for the corridor to determine the required cooling capacity. The VA has provided only general information; it is the contractor s design team s responsibility to determine the actual requirements and verify whether the chiller recommended by the VA is sufficient.
This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.
Start Free| Issuing agency | 242-Network Contract Office 02 (36C242) |
|---|
| Country | United States |
|---|
| Category | Government Procurement |
|---|
| NAICS | 236220 - Commercial and Institutional Building Construction |
|---|
| PSC | Y1DA |
|---|
| Published | July 23, 2026 |
|---|
| Procurement stage | Solicitation |
|---|
| Closed | August 07, 2026 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Official source | View original notice · Get alerts for tenders like this |
|---|
| Last verified | November 23, 2026 |
|---|
Source: U.S. Government (SAM.gov) — public domain. GlobalGov is not affiliated with or endorsed by the United States Government.
See every United States opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Your 14-Day Free TrialFree 14-day trial · cancel anytime
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free United States Government Procurement intelligence report in your inbox
A personalized report on United States Government Procurement opportunities, emailed in 5-10 minutes. One per month, no account needed.