Electrical Installation Government Tenders in Egypt

Who buys electrical installation in Egypt, what it is worth, how long you get to bid, and what is open today. Counted 2026-10-01.

26
Records tracked
9
Buying organisations
0
Open right now
49 days
Median response window

Competence, certification and the paperwork that makes an installation legal

Electrical work is one of the most tightly regulated trades a public buyer procures, and competence is evidenced at two levels. The enterprise holds registration with a recognised body that audits its work; the individuals hold qualifications for the specific activity, including separate authorisation for high-voltage work, testing and inspection. Buyers verify both, and they verify the scope of the registration, because a contractor registered for domestic work is not thereby competent for a substation.

The deliverable that closes the job is a certificate, not a completed installation. Installation certificates, test results for continuity, insulation resistance, earth fault loop impedance and residual current device operation, and as-installed drawings and schedules are required before handover and are the evidence the buyer holds for its own statutory duties. Periodic inspection and testing on a defined cycle is a separate recurring requirement that is often let in the same contract and priced per circuit or per distribution board.

Work in occupied buildings is governed by isolation rather than by programme. Live working is normally prohibited, so the job depends on planned shutdowns agreed with the occupier, often at night or at weekends, under a permit to work with lock-off and proving procedures. Where standby generation, uninterruptible supplies or life safety systems are involved, the sequence of isolation is designed rather than improvised. Bidders who price the installation and not the access windows consistently underestimate these contracts, and buyers who do not specify the windows receive prices that assume the worst.

This section describes how this category is bought generally, across the public buyers that publish it. The figures elsewhere on this page are measured for this market alone.

Who buys electrical installation in Egypt?

GlobalGov holds 26 electrical installation records from 9 distinct buying organisations in Egypt. The most frequent publishers are Holding Company for Water & Wastewater (HCWW) (7 records); Gharbia Company for Water and Wastewater (6 records); Kafr El-Sheikh Water Supply and Sanitation Company (KSWSSC), Project Implementation Unit (PIU) (4 records); Dakahlia Water and Sanitation Company (3 records); Construction Authority for Potable Water and Wastewater (CAPW) (2 records); Holding Company For Water And Wastewater (HCWW) (1 record). Between them the 6 largest account for 88% of everything published, so buying here is concentrated in a few authorities.

Buying organisationRecordsShare
Holding Company for Water & Wastewater (HCWW)727%
Gharbia Company for Water and Wastewater623%
Kafr El-Sheikh Water Supply and Sanitation Company (KSWSSC), Project Implementation Unit (PIU)415%
Dakahlia Water and Sanitation Company312%
Construction Authority for Potable Water and Wastewater (CAPW)27.7%
Holding Company For Water And Wastewater (HCWW)13.8%

How long do bidders get to respond to electrical installation tenders in Egypt?

Across the 6 Egypt electrical installation notices that publish both a publication date and a closing date, the median response window is 49 days. A quarter of them allowed 34 days or fewer and a quarter stayed open for more than 81. Not one of them closed within a fortnight of being published, so the window on this market is consistently workable.

How often are electrical installation tenders published in Egypt?

Egypt has published nothing in this category in the last twelve months. Over the last three years there were 11, spread across 17 separate months of activity since 1 April 2022. September is historically the busiest month. No new notice has been published in this category since 9 April 2025, 540 days ago, so treat the figures above as a record of the market rather than as this week's pipeline.

How does Egypt compare with other electrical installation markets?

Among the 19 countries where GlobalGov holds a comparable electrical installation market, Egypt ranks 17th by number of records. The largest is Germany (814 records against 26 here).

Where do the Egypt electrical installation records on this page come from?

These 26 records are collected from 1 official source: TED (26). GlobalGov is an independent aggregator and is not affiliated with any of them; each record links back to the notice on its issuing portal. The set is rebuilt nightly, and the counts on this page were taken on 2026-10-01.

Most recent Electrical Installation tenders in Egypt

None of these are open for bids now — they are the most recent records GlobalGov holds for this market, kept here so the shape of a typical electrical installation notice in Egypt is visible. Set an alert to be told when the next one opens.

Egypt – Wastewater treatment plant construction work – Procurement of Rehabilitation and Upgrade of Tala Wastewater Treatment Plant

Minya Company for Water and WastewaterValue not disclosedApril 09, 2025

Egypt – Wastewater treatment plant construction work – Design and Build of EL Nassrya Wastewater Treatment Plant 10,000 m3/day

Kafr El Shiekh Water and Sanitation CompanyValue not disclosedApril 04, 2024

Egypt-Cairo: Wastewater treatment plant construction work

Holding Company for Water & Wastewater (HCWW)Value not disclosedApril 01, 2022
All Egypt procurement →

Electrical Installation procurement in other markets

GermanyUnited StatesFranceRomaniaPolandItalyPortugalCzech RepublicSwitzerlandNetherlandsSpainCroatia