Buying supply, generation and efficiency under one heading
Energy notices cover three different transactions that a bidder should separate before responding. The first is supply: a contract to deliver electricity or gas to meter points, priced as a unit rate with standing charges, awarded for a term and increasingly specified by generation source. The second is generation or connection assets -- plant, substations, heat networks, storage -- which is capital works with commissioning and grid connection at its center. The third is performance-based efficiency work, which is a financing structure as much as a construction one.
Supply contracts turn on when the price is fixed. Buyers may take a fixed price for the whole term, fix in tranches as the market moves, or buy flexibly against a wholesale index with a supplier managing the purchasing, and the tender states which. Each puts the price risk in a different place, and comparing bids across mechanisms is not possible without modeling them on a common basis. Where renewable or low-carbon content is required, buyers now ask for certificate-backed evidence rather than a description of the supplier's generation mix.
Performance contracting deserves its own reading. In these arrangements the supplier designs and installs measures -- lighting, controls, heat generation, fabric -- and is paid from the savings, sometimes with a guarantee that underwrites them. The whole contract then rests on the measurement and verification protocol: the agreed baseline, the adjustments for weather and occupancy, and who measures. Bidders and buyers who negotiate the technology before the measurement protocol usually end up arguing about the measurement protocol.
This section describes how this category is bought generally, across the public buyers that publish it. The figures elsewhere on this page are measured for this market alone.
Who buys energy in Ireland?
GlobalGov holds 796 energy records from 272 distinct buying organizations in Ireland. The most frequent publishers are The Office Of Government Procurement (29 records); Galway City Council (26 records); Bord Na Móna PLC (21 records); Iarnród Eireann-irish Rail (21 records); Education Procurement Service (eps) (18 records); Wexford County Council (18 records). Between them the 6 largest account for 17% of everything published, so buying here is spread across many separate authorities.
| Buying organization | Records | Share |
|---|---|---|
| The Office Of Government Procurement | 29 | 3.6% |
| Galway City Council | 26 | 3.3% |
| Bord Na Móna PLC | 21 | 2.6% |
| Iarnród Eireann-irish Rail | 21 | 2.6% |
| Education Procurement Service (eps) | 18 | 2.3% |
| Wexford County Council | 18 | 2.3% |
What are energy contracts worth in Ireland?
265 of the 796 records publish a contract value. The median is $297,000 and the largest single published value is $324.0M. By size, 67 under $100k, 115 between $100k and $1M, 55 between $1M and $10M, 28 above $10M. The remaining 531 publish no value at all, so every figure here describes the priced subset only, and values are as stated by the buyer rather than as finally awarded.
| Contract size | Records | Share of priced |
|---|---|---|
| under $100k | 67 | 25% |
| between $100k and $1M | 115 | 43% |
| between $1M and $10M | 55 | 21% |
| above $10M | 28 | 11% |
How long do bidders get to respond to energy tenders in Ireland?
Across the 571 Ireland energy notices that publish both a publication date and a closing date, the median response window is 23 days. A quarter of them allowed 21 days or fewer and a quarter stayed open for more than 31. Short turnarounds are the exception rather than the rule here: only 34 (6.0%) closed within a fortnight of being published.
How often are energy tenders published in Ireland?
Ireland publishes about 8 notices a month in this category, 100 in the last twelve months. That is 96% more than the 51 published in the twelve months before that. Over the last three years there were 201, spread across 163 separate months of activity since 30 January 2013. May is historically the busiest month. The most recent was published 18 November 2026.
How does Ireland compare with other energy markets?
Among the 49 countries where GlobalGov holds a comparable energy market, Ireland ranks 22nd by number of records. The largest is Australia (8,220 records against 796 here). Within Ireland itself, energy is the 15th largest of the 66 procurement categories tracked here.
Where do the Ireland energy records on this page come from?
These 796 records are collected from 3 official sources: Ireland Etenders (641), TED (153), the Kenya PPRA (2). GlobalGov is an independent aggregator and is not affiliated with any of them; each record links back to the notice on its issuing portal. The set is rebuilt nightly, and the counts on this page were taken on 2026-11-22.
Open Energy tenders in Ireland
Showing 4 of the 6 notices open in this category today. Openness uses the same definition as the Ireland market page: active, not marked awarded, cancelled, closed or expired, and either closing in the future or published within the last 90 days with no stated closing date.
Ireland – Wind-energy generators – PMC for Wind Turbine Generators (WTG) for Tonn Nua Offshore Wind Project
Ireland – Gas pressure equipment – 25/063 Pressure Reduction Systems and Filtering and Metering System QS
Ireland – Business and management consultancy services – 26/027 - Professional Services Qualification System for the Strategic Gas Emergency Reserve
Other procurement categories in Ireland
Energy procurement in other markets
Never Miss a Ireland Government Contract
Finding Ireland tenders usually means a local portal, a local registration and someone who reads the language. Get an alert you can read when a new energy opportunity is published there.