Review and Updating of Feasibility Studies, Technical Assessments and Detailed Engineering Design for Irrigation Schemes

World Bank -- GFPP to Support Preparation of Competitive, Resilient Agriculture and Irrigation Services (CRAIS) in · Azerbaijan government procurement

Bidding on World Bank-funded work in Azerbaijan? Get new Consulting tenders there by email, free: Set up alerts

Closed November 16, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

ADDENDUM No 1

TO THE REQUEST FOR EXPRESSIONS OF INTEREST

(CONSULTING SERVICES – FIRMS SELECTION)

The Republic of Azerbaijan

Project Preparation in relation to: Competitive and Resilient Agriculture and Irrigation Services (CRAIS) Project

Loan/Grant No.: TF0D1739

Assignment Title: Review and Updating of Feasibility Studies, Technical Assessments and Detailed Engineering Design for Irrigation Schemes

Reference No.: CRAIS-P515925-CS-CQS/1

CLARIFICATION RESPONSES REGARDING THE TERMS OF REFERENCE

The following clarifications are provided to ensure a common understanding among all prospective consultants of the scope of the assignment.

As set out in the Terms of Reference (TOR), the assignment is structured in three phases:

• Phase 1 covers review of existing studies, feasibility studies, technical-economic assessments, conceptual designs, hydraulic data, operational records, and intensive technical consultations with ASWRA, irrigation institutions, local stakeholders, and relevant government entities regarding rehabilitation and modernization priorities for the irrigation schemes under Component 1 validating the viability and readiness of the irrigation schemes for World Bank financing, and identifying the needs and scope for updating existing documentation.
• Phase 2 covers the preparation or updating of the necessary technical and economic assessments and feasibility studies for all viable sub-projects identified under Phase 1. The selected priority sub-project will be addressed as a priority to inform the subsequent detailed design work. The feasibility-level work for the remaining viable schemes should provide the necessary inputs for CRAIS project appraisal.
• Phase 3 is limited to the selected priority sub-project and covers the detailed engineering design and preparation or updating of the technical documentation required to bring that sub-project to full procurement and implementation readiness.

Accordingly, the clarifications below should be read...

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyWorld Bank -- GFPP to Support Preparation of Competitive, Resilient Agriculture and Irrigation Services (CRAIS) in
CountryAzerbaijan
CategoryConsulting
PublishedOctober 29, 2026
Procurement stageSources Sought
ClosedNovember 16, 2026
StatusClosed — no longer accepting responses
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 22, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

See every Azerbaijan Consulting opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Azerbaijan Consulting intelligence report in your inbox

A personalized report on Azerbaijan Consulting opportunities, emailed in 5-10 minutes. One per month, no account needed.