France – Construction work – EXTENSION DU TERMINAL 3 DE L’AÉROPORT DE PARIS CHARLES DE GAULLE

Aeroports DE Paris · France government procurement

Get new France Building Construction tenders by email, free: Set up alerts

This opportunity is now closed. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$241.7M
Est. Value
Closed
Status

Opportunity Overview

La présente consultation a pour objet la réalisation de travaux de conception réalisation réalisés sur le Terminal 3 de la plateforme de Paris Charles de Gaulle (CDG). Le marché portera notamment sur : i) La construction d'une nouvelle jetée d'embarquement, débarquement ; ii) La construction d'une structure au moins en R+1 hébergeant notamment une surface commerciale ainsi qu'une surface destinée aux contrôles de frontière départ ; iii) L'extension d'un bâtiment existant hébergeant une salle de livraison bagages et une zone de frontière arrivée. Des opérations d'aménagement seront également réalisées conformément aux spécifications d’Aéroports de Paris décrites dans le Programme. Ces ouvrages et extensions sont conçues pour garantir le fonctionnement opérationnel le plus efficace possible aux bénéfices de compagnies qui opèrent selon le modèle dit "low-cost", tout en offrant aux passagers, clients et personnels qui y travaillent des conditions conformes aux exigences de qualité d'Aéroports de Paris. L'ensemble de l'opération doit être livré pour fin 2029 au plus tard.. Compte tenu des développements envisagés à moyen et long terme sur la plateforme de Paris Charles de Gaulle dans le cadre de son schéma directeur, le Terminal 3 pourrait être détruit à l'horizon 2050, soit 20 ans après la livraison des ouvrages et extensions bâtimentaires objet du présent marché. Les offres remises devront tenir compte de ce caractère non nécessairement pérenne.

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyAeroports DE Paris
CountryFrance
CategoryBuilding Construction
Estimated value$241.7M
PublishedSeptember 22, 2026
Procurement stageSolicitation
ClosedClosing date not published
StatusClosed — no longer accepting responses
Original languageFrench — members read it in their own language
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 24, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in France

Public service concession for the design, construction and operation of heat networks on Tours Nord/Saint-Cyr-sur-Loire and Ballan-Miré, Lyunes and Metray.
Global Performance Contract (GMGP) for the modernization and operation of the Rillieux-la-Pape waste treatment and energy recovery facility (Lyon North UTVE)
France – Railway station construction work – Design, construction and maintenance of Suse international railway station
Production, construction and maintenance of the international station of our country
France – Construction work – Grant of work for the renovation and operation of the horsepower centre of Boulogne

See every France Building Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free France Building Construction intelligence report in your inbox

A personalized report on France Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.