“Construction of an approximately 850 MW natural gas-fired power plant in Ișalnița (“CCGT Ișalnița”)” – design, procurement, construction, commissioning, and long-term maintenance services
Original title (Hungarian): Romania – Construction work for power plant – ”Construirea unui bloc energetic de cca. 850MW pe gaz natural la Ișalnița ("CCGT Ișalnița")” – proiectare, achizitie, execuție lucrări, punere in functiune si servicii de mentenanta pe termen lung
Societatea CCGT POWER Isalnita SA · Romania government procurement
Closed November 14, 2025. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.
The object of the contract is the design and execution of the construction works of a natural gas power plant including a combined cycle gas-steam turbine (CCGT) for the production of electricity with a capacity of approx. 850 MW, including the commissioning and provision of LTSA maintenance services for the main equipment (gas turbine, steam turbine and generators, including their auxiliary systems) for a period of 13 years. The activities that are the subject of the contract will be carried out in accordance with the requirements imposed by the award documentation. The Terms of Reference present the minimum requirements necessary for the performance of the contract. The estimated value of the contract does not include miscellaneous and unforeseen expenses and consists of: 3,172,710,000 lei (CAPEX), the estimated value for the design and execution of the works, including commissioning 597,216,000 lei (LTSA), the estimated value for LTSA maintenance services for the main equipment.
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | Societatea CCGT POWER Isalnita SA |
|---|
| Country | Romania |
|---|
| Category | Power Transmission |
|---|
| Estimated value | $829.4M |
|---|
| Published | October 10, 2025 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | November 14, 2025 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Translation | Translated from Hungarian by GlobalGov’s translation pipeline |
|---|
| Official source | View original notice |
|---|
| Last verified | September 20, 2026 |
|---|
Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.
See every Romania Power Transmission opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Romania Power Transmission intelligence report in your inbox
A personalized report on Romania Power Transmission opportunities, emailed in 5-10 minutes. One per month, no account needed.