Germany – Road bridge construction work – A14, Los 2.2 Streckenbau und Bauwerke

DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH · Germany government procurement

Closed January 09, 2024. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

New construction of the A14 motorway between the Seehausen North interchange and the Elbe bridge (left bank) and the Elbe bridge (right bank) and the Wittenberge interchange, over a total length of 11 km. Main road construction volumes: 2,500,000 m³ earthworks; 380,000 m² bituminous road surface; 11,500 m reinforced concrete drainage pipes with inspection chambers; 10,000 m sheet pile walls for slope stabilization; 320 m³ reinforced concrete; 165 t reinforcing steel; 10,000 m cable duct trench; new construction of one parking area with toilets each east and west of the A14. The main construction volumes include the new construction of structures 119A, 121A, 122A, 123A, 125A, 127A, 128.1A, 129A, 130A, 02A, 03A, 04A and 05A along the A14 motorway over farm tracks, ditches and a railway line. These are 13 reinforced concrete frame structures with the following main dimensions: Span: 6.50 to 12.00 m; Width between supports: 28.60 m; Clearance: 1.40 m; Shallow foundation, bored pile foundation or driven concrete pile foundation, partly with soil replacement. The main volumes are as follows: approx. 66,500 m³ earthworks; approx. 20,300 m³ reinforced concrete work; approx. 3,000 t reinforcing steel; approx. 5,100 m² Structural waterproofing and bridge decking: approx. 4,000 m cast-in-place concrete driven piles d= 0.56 m, approx. 6,400 m bored piles d=0.90 to 1.20 m, approx. 1,650 m² paving. New construction of structure 120A along the A14 motorway over the Aland River, steel composite bridge over 3 spans. Structure length 105 m, width between spans: 14.10 m. Constructed using the incremental launching method. Deep foundation on cast-in-place bored piles with the following main volumes: approx. 3,500 m³ earthworks, approx. 8,900 m³ reinforced concrete, approx. 1,051 t structural steel including corrosion protection, approx. 1,100 t reinforcing steel, approx. 1,100 m bored piles d=1.50 m, approx. 5,200 m² sheet pile walling, approx. 3,300 m² waterproofing and bridge...

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyDEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH
CountryGermany
CategoryRenovation Rehabilitation
CPV45221111
PublishedNovember 07, 2023
Procurement stageActive solicitation
ClosedJanuary 09, 2024
StatusClosed — no longer accepting responses
Official sourceView original notice
Last verifiedOctober 06, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in Germany

Germany – Construction work for multi-dwelling buildings and individual houses – Rahmenvereinbarung Serielles Sanieren
Germany – Architectural, engineering and planning services – Regelmäßige nichtverbindliche Bekanntmachung zur Fristverkürzung A&I
Germany – Engineering services – Technische Projekt- und Ingenieursleistungen
Germany – Railway tunnel construction work
Germany – Railway tunnel construction work – 14TEI10205 2. S-Bahn-Stammstrecke München – VE 30 Rohbauarbeiten Tunnel West mit Trog und Hp HauptbahnhofBahnhofplatz
Germany – Railway tunnel construction work – 14TEI10205 2. S-Bahn-Stammstrecke München – VE 30 Rohbauarbeiten Tunnel West mit Trog und Hp HauptbahnhofBahnhofplatz
Germany – Railway tunnel construction work – 14TEI10205 2. S-Bahn-Stammstrecke München – VE 30 Rohbauarbeiten Tunnel West mit Trog und Hp HauptbahnhofBahnhofplatz
Germany – Railway tunnel construction work – 14TEI10205 2. S-Bahn-Stammstrecke München – VE 30 Rohbauarbeiten Tunnel West mit Trog und Hp HauptbahnhofBahnhofplatz

See every Germany Renovation Rehabilitation opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Germany Renovation Rehabilitation intelligence report in your inbox

A personalized report on Germany Renovation Rehabilitation opportunities, emailed in 5-10 minutes. One per month, no account needed.