Poland – Engineering design services for the construction of civil engineering works – Opracowanie dokumentacji projektowo-kosztorysowej dla realizacji zadań małej retencji nizinnej (MRN3) w Nadleśnictwie Koszęcin

Economic Affairs · Poland government procurement

Closed November 04, 2025. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

The subject of the contract is the preparation of complete design documentation (hereinafter referred to as documentation), along with obtaining the opinions, approvals, and administrative decisions required by construction law, as well as providing authorial supervision for the following project: Project description: Reconstruction of bead ponds in the Dyrdy forest district, revitalization of slopes, desilting of pond bottoms, and replacement of overflow and discharge facilities. Retention area: 5.20 ha. Minimum capacity of small retention facilities: 70,000.00 m3. Minimum volume of retained water: 35,000.00 m3. Administrative addresses: Woźniki Commune – rural area, Piasek district, plot no.: 108, 103, 95, 626. Forest addresses: 02-16-1-12-535-g-00, 02-16-1-12-582-b-00, 02-16-1-12-582-f-00 – location according to graphic attachment No. 1. Task settlement number: 02-16-1.1-01. | The subject of the order is the preparation of complete design documentation (hereinafter referred to as the documentation), together with obtaining the opinions, arrangements and administrative decisions required by building law, and performing author’s supervision for the following task: Task description: Reconstruction of beadwork ponds in the Dyrdy forestry district, revitalization of slopes, desludging of the pond bottom, replacement of overflow and discharge devices. Retention area: 3.20 ha. Minimum capacity of small retention facilities: 40,000.00 m3. Minimum volume of retained water: 20,000.00 m3. Administrative addresses: Woźniki Commune – town, Dyrdy district, plots: 316, 319. Forest addresses: 02-16-1-12-578-b-00, 02-16-1-12-578-f-00, 02-16-1-12-578-h-00 – location according to graphic attachment No. 2. Task settlement number: 02-16-1.1-02. | The subject of the contract is the preparation of complete design documentation (hereinafter referred to as documentation), along with obtaining the opinions, approvals, and administrative decisions required by construction law, as well as...

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyEconomic Affairs
CountryPoland
CategoryManagement Consulting
CPV71322000
PublishedSeptember 30, 2025
Procurement stageActive solicitation
ClosedNovember 04, 2025
StatusClosed — no longer accepting responses
TranslationTranslated from Hungarian by GlobalGov’s translation pipeline
Official sourceView original notice
Last verifiedAugust 12, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in Poland

Poland – Occupational clothing, special workwear and accessories – 2.2.1 DOSTAWY UBRAŃ I OBUWIA ROBOCZYCH I OCHRONNYCH, W TYM ARTYKUŁÓW BHP
Poland – Refuse and waste related services – Odbieranie i zagospodarowanie stałych odpadów komunalnych od właścicieli nieruchomości zamieszkałych położonych na terenie gminy Barcin oraz nieruchomości niezamieszkałych należących do Gminy Barcin
Naprawa główna i modifikacja simulatora operatorów broni podwodnej CBM w centrum szkolenia marynarki wojennej ustka
Poland – Furniture – 2.2.5 DOSTAWY WYPOSAŻENIA KWATERUNKOWEGO - ŚWIDWIN
Ammunition delivery
Poland – Construction work – Sieć wodociągowa roboty budowlane polegające na budowie, przebudowie, rozbudowie, remoncie sieci wodociągowej oraz budynków i budowli technologicznych z nią powiązanych
Poland – Chemical products – ŚRODKI CHEMICZNE
Poland – Construction work – Sieć kanalizacyjna ­ roboty budowlane polegające na budowie, przebudowie, rozbudowie, remoncie sieci kanalizacyjnej oraz budynków i budowli technologicznych z nią powiązanych

See every Poland Management Consulting opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Poland Management Consulting intelligence report in your inbox

A personalized report on Poland Management Consulting opportunities, emailed in 5-10 minutes. One per month, no account needed.