The execution works for the project "Automation of the RED MT in the Northern Transylvania area, in order to identify and isolate the faulty network area", will be carried out according to the attached documentation. In order to achieve the proposed results, the following will be carried out in this work: The work is structured in two components, as follows: a) Component C1- Modernization of switching equipment in the medium voltage network This component includes on the one hand the replacement of existing, classic equipment in medium voltage lines with new, remote-controlled ones and the replacement of classic cells in transformer stations with new cells, with motorized equipment. The modernization of switching equipment in the medium voltage network involves: - Installation of a number of 90 remote-controlled reclosers; - Installation of a number of 376 remote-controlled disconnectors; - Installation of a number of 855 remote-controlled medium voltage cells in transformer stations or supply points; - Installation of 320 own service panels in transformer stations or supply points; - Installation of 343 telecommunications cabinets in transformer stations or supply points; b) Component C2 Digitalization of the medium voltage network This component includes the equipment necessary for digitalization, as well as the integration works of the equipment in the existing SCADA-SAD system of – Installation of 810 SCADA equipment assemblies and their integration into the existing SCADA/DMS of each branch. Note: Requests for clarification regarding the award documentation will be sent at least 20 days before the deadline set for submitting offers and the consolidated response of the contracting entity in a clear, complete and unambiguous manner to all requests for clarification or additional inf. will be sent 10 days before the deadline set for submitting offers. The contracting entity will only respond to requests for clarification addressed by economic operators by the...
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | Distribuție Energie ElectricĂ Romania S.a. |
|---|
| Country | Romania |
|---|
| Category | Civil Construction |
|---|
| Estimated value | $40.2M |
|---|
| CPV | 45310000 |
|---|
| Published | March 17, 2025 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | May 02, 2025 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Official source | View original notice |
|---|
| Last verified | October 06, 2026 |
|---|
Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.
See every Romania Civil Construction opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Romania Civil Construction intelligence report in your inbox
A personalized report on Romania Civil Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.