Design and Execution of the work: "Increasing the distribution capacity by modernizing the 110kV Târgu Mureș-Livezeni-Corunca-Fântânele OHL, respectively the Tg. Mureș, Livezeni, Corunca and Târnăveni transformer stations", will be done according to the attached documentation. In order to achieve the proposed results, the following will be performed in this work: • Re-conduction of overhead power lines This component targets the following overhead power lines: - 110kV Fântânele Corunca OHL - in full, over a distance of 18.05km - 110kV Corunca Livezeni OHL - over a section of 1.8km; In total, we will be able to count 19.85 km of modernized OHL. • Implementation of LES instead of OHL This chapter provides for the replacement of overhead lines with underground ones, over a distance of 7.5km, as follows: - Corunca – Livezeni OHL will be introduced in underground cable over a distance of 3km; - Livezeni-Târgu Mureș OHL will be completely replaced with underground cable over a distance of 4.5km • Modernization of electrical substations: Modernization of Târgu Mureș substation by replacing its outdated primary and secondary equipment and implementing a single sectioned busbar at the 110kV level; Modernization of Târnăveni substation, primary and secondary circuits. In Târnăveni substation, a 110kV double busbar scheme will be implemented, and one of the bars will be sectioned by the longitudinal coupler; Modernization of Livezeni transformer substation and equipping it with two new power transformers, of higher power than the existing ones. Livezeni substation will be modernized both in terms of primary and secondary equipment. The substation scheme will be with a single sectioned busbar at the 110kV level. Modernization of the primary circuits in the Corunca station by replacing obsolete primary equipment in the 110kV outdoor station.
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | General Public Services, Electricity |
|---|
| Country | Romania |
|---|
| Category | Civil Construction |
|---|
| CPV | 45310000 |
|---|
| Published | January 31, 2025 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | March 06, 2025 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Translation | Translated from Hungarian by GlobalGov’s translation pipeline |
|---|
| Official source | View original notice |
|---|
| Last verified | August 12, 2026 |
|---|
Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.
See every Romania Civil Construction opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Romania Civil Construction intelligence report in your inbox
A personalized report on Romania Civil Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.