Buying supply, generation and efficiency under one heading
Energy notices cover three different transactions that a bidder should separate before responding. The first is supply: a contract to deliver electricity or gas to meter points, priced as a unit rate with standing charges, awarded for a term and increasingly specified by generation source. The second is generation or connection assets -- plant, substations, heat networks, storage -- which is capital works with commissioning and grid connection at its center. The third is performance-based efficiency work, which is a financing structure as much as a construction one.
Supply contracts turn on when the price is fixed. Buyers may take a fixed price for the whole term, fix in tranches as the market moves, or buy flexibly against a wholesale index with a supplier managing the purchasing, and the tender states which. Each puts the price risk in a different place, and comparing bids across mechanisms is not possible without modeling them on a common basis. Where renewable or low-carbon content is required, buyers now ask for certificate-backed evidence rather than a description of the supplier's generation mix.
Performance contracting deserves its own reading. In these arrangements the supplier designs and installs measures -- lighting, controls, heat generation, fabric -- and is paid from the savings, sometimes with a guarantee that underwrites them. The whole contract then rests on the measurement and verification protocol: the agreed baseline, the adjustments for weather and occupancy, and who measures. Bidders and buyers who negotiate the technology before the measurement protocol usually end up arguing about the measurement protocol.
This section describes how this category is bought generally, across the public buyers that publish it. The figures elsewhere on this page are measured for this market alone.
Who buys energy in Denmark?
GlobalGov holds 115 energy records from 81 distinct buying organizations in Denmark. The most frequent publishers are Danish Ministry of Defence Acquisition and Logistics Organisation (5 records); Rigspolitiet (4 records); Dansk RestproduktHåndtering Amba (3 records); Energinet (3 records); Energinet Eltransmission A/S (3 records); Region Hovedstaden, Herlev Hospital (3 records). Between them the 6 largest account for 18% of everything published, so buying here is spread across many separate authorities.
| Buying organization | Records | Share |
|---|---|---|
| Danish Ministry of Defence Acquisition and Logistics Organisation | 5 | 4.3% |
| Rigspolitiet | 4 | 3.5% |
| Dansk RestproduktHåndtering Amba | 3 | 2.6% |
| Energinet | 3 | 2.6% |
| Energinet Eltransmission A/S | 3 | 2.6% |
| Region Hovedstaden, Herlev Hospital | 3 | 2.6% |
What are energy contracts worth in Denmark?
65 of the 115 records publish a contract value. The median is $2.6M and the largest single published value is $87.0M. By size, 2 under $100k, 16 between $100k and $1M, 32 between $1M and $10M, 15 above $10M. The remaining 50 publish no value at all, so every figure here describes the priced subset only, and values are as stated by the buyer rather than as finally awarded.
| Contract size | Records | Share of priced |
|---|---|---|
| under $100k | 2 | 3.1% |
| between $100k and $1M | 16 | 25% |
| between $1M and $10M | 32 | 49% |
| above $10M | 15 | 23% |
How long do bidders get to respond to energy tenders in Denmark?
Across the 35 Denmark energy notices that publish both a publication date and a closing date, the median response window is 30 days. A quarter of them allowed 28 days or fewer and a quarter stayed open for more than 33. Short turnarounds are the exception rather than the rule here: only 5 (14%) closed within a fortnight of being published.
How often are energy tenders published in Denmark?
Denmark publishes about 3 notices a month in this category, 38 in the last twelve months. Over the last three years there were 46, spread across 55 separate months of activity since 24 June 2016. September is historically the busiest month. The most recent was published 16 November 2026.
How does Denmark compare with other energy markets?
Among the 49 countries where GlobalGov holds a comparable energy market, Denmark ranks 41st by number of records. The largest is Australia (8,220 records against 115 here). Within Denmark itself, energy is the 29th largest of the 54 procurement categories tracked here.
Where do the Denmark energy records on this page come from?
These 115 records are collected from 3 official sources: TED (113), Doffin (1), the Sweden TED feed (1). GlobalGov is an independent aggregator and is not affiliated with any of them; each record links back to the notice on its issuing portal. The set is rebuilt nightly, and the counts on this page were taken on 2026-11-22.
Open Energy tenders in Denmark
Showing 5 of the 6 notices open in this category today. Openness uses the same definition as the Denmark market page: active, not marked awarded, cancelled, closed or expired, and either closing in the future or published within the last 90 days with no stated closing date.
Denmark – Electrical installation work – Supply of Svestrup waterworks, Electricity Contract
Denmark – Electric motors, generators and transformers – SMC-6.2 Power Transformer and 132 kV Gas Insulated Switchgear
Denmark – Research and development services and related consultancy services – EEA/CCE/TC/26/012 - Topic Centre on Energy System Decarbonisation
Denmark – Fuel oils – Supplementary notice to notice 2022/S 171485785 and 538610-2026 + Fuel Supply GEN
Other procurement categories in Denmark
Energy procurement in other markets
Never Miss a Denmark Government Contract
Finding Denmark tenders usually means a local portal, a local registration and someone who reads the language. Get an alert you can read when a new energy opportunity is published there.
Start Free Trial