Energy Government Tenders in Sweden

Who buys energy in Sweden, what it is worth, how long you get to bid, and what is open today. Counted 2026-11-22.

670
Records tracked
354
Buying organizations
17
Open right now
30 days
Median response window

Buying supply, generation and efficiency under one heading

Energy notices cover three different transactions that a bidder should separate before responding. The first is supply: a contract to deliver electricity or gas to meter points, priced as a unit rate with standing charges, awarded for a term and increasingly specified by generation source. The second is generation or connection assets -- plant, substations, heat networks, storage -- which is capital works with commissioning and grid connection at its center. The third is performance-based efficiency work, which is a financing structure as much as a construction one.

Supply contracts turn on when the price is fixed. Buyers may take a fixed price for the whole term, fix in tranches as the market moves, or buy flexibly against a wholesale index with a supplier managing the purchasing, and the tender states which. Each puts the price risk in a different place, and comparing bids across mechanisms is not possible without modeling them on a common basis. Where renewable or low-carbon content is required, buyers now ask for certificate-backed evidence rather than a description of the supplier's generation mix.

Performance contracting deserves its own reading. In these arrangements the supplier designs and installs measures -- lighting, controls, heat generation, fabric -- and is paid from the savings, sometimes with a guarantee that underwrites them. The whole contract then rests on the measurement and verification protocol: the agreed baseline, the adjustments for weather and occupancy, and who measures. Bidders and buyers who negotiate the technology before the measurement protocol usually end up arguing about the measurement protocol.

This section describes how this category is bought generally, across the public buyers that publish it. The figures elsewhere on this page are measured for this market alone.

Who buys energy in Sweden?

GlobalGov holds 670 energy records from 354 distinct buying organizations in Sweden. The most frequent publishers are Ellevio AB (14 records); Förvaltningsrätten (11 records); Region Östergötland (9 records); Sjöfartsverket (9 records); Bostadsaktiebolaget Svedalahem (7 records); Försäkrings AB Göta Lejon (7 records). Between them the 6 largest account for 8.5% of everything published, so buying here is spread across many separate authorities.

Buying organizationRecordsShare
Ellevio AB142.1%
Förvaltningsrätten111.6%
Region Östergötland91.3%
Sjöfartsverket91.3%
Bostadsaktiebolaget Svedalahem71.0%
Försäkrings AB Göta Lejon71.0%

What are energy contracts worth in Sweden?

387 of the 670 records publish a contract value. The median is $960,000 and the largest single published value is $288.0M. By size, 9 under $100k, 191 between $100k and $1M, 135 between $1M and $10M, 52 above $10M. The remaining 283 publish no value at all, so every figure here describes the priced subset only, and values are as stated by the buyer rather than as finally awarded.

Contract sizeRecordsShare of priced
under $100k92.3%
between $100k and $1M19149%
between $1M and $10M13535%
above $10M5213%

How long do bidders get to respond to energy tenders in Sweden?

Across the 301 Sweden energy notices that publish both a publication date and a closing date, the median response window is 30 days. A quarter of them allowed 28 days or fewer and a quarter stayed open for more than 33. Short turnarounds are the exception rather than the rule here: only 26 (8.6%) closed within a fortnight of being published.

How often are energy tenders published in Sweden?

Sweden publishes about 14 notices a month in this category, 169 in the last twelve months. That is 39% more than the 122 published in the twelve months before that. Over the last three years there were 345, spread across 101 separate months of activity since 28 June 2016. October is historically the busiest month. The most recent was published 16 November 2026.

How does Sweden compare with other energy markets?

Among the 49 countries where GlobalGov holds a comparable energy market, Sweden ranks 25th by number of records. The largest is Australia (8,220 records against 670 here). Within Sweden itself, energy is the 24th largest of the 66 procurement categories tracked here.

Where do the Sweden energy records on this page come from?

These 670 records are collected from 2 official sources: TED (440), the Sweden TED feed (230). GlobalGov is an independent aggregator and is not affiliated with any of them; each record links back to the notice on its issuing portal. The set is rebuilt nightly, and the counts on this page were taken on 2026-11-22.

Open Energy tenders in Sweden

Showing 10 of the 17 notices open in this category today. Openness uses the same definition as the Sweden market page: active, not marked awarded, cancelled, closed or expired, and either closing in the future or published within the last 90 days with no stated closing date.

Sweden – Petroleum products, fuel, electricity and other sources of energy – Readiness Tank

Sundsvalls kommun$960,000November 16, 2026

Sweden – Energy and related services – Framework agreement for conducting energy declarations

Norrköpings kommun$384,000November 16, 2026

Sweden – Petroleum products, fuel, electricity and other sources of energy – Vehicle fuel in bulk and at pump

Alingsås Kommun$3.6MNovember 11, 2026

Sweden – Electricity – Electric power

HBV$2.9MOctober 27, 2026

Sweden – Petrol – Station fueling (fuel stations) Dynamic procurement system (DIS)

Region GotlandValue not disclosedOctober 27, 2026

Sweden – Blood analysers – Instruments for blood gas analysis

Region Gotland$2.2MOctober 26, 2026

Sweden – Energy-efficiency consultancy services – Controls and Regulations

Riksdagsförvaltningen$1.9MOctober 26, 2026

Sweden – Petroleum products, fuel, electricity and other sources of energy – Coal source for the treatment plant

Ängelholms kommun$460,800October 26, 2026

Sweden – Propergol fuels – Fuel

Filipstads kommun$1.5MOctober 21, 2026

Sweden – Ancillary works for electricity power lines – Procurement of Earthworks – Framework Agreement for Excavation, Construction and Transport Services

International buyer$5.4MOctober 20, 2026
All Sweden procurement →

Other procurement categories in Sweden

Building ConstructionSoftware DevelopmentMedical EquipmentMaintenance & RepairCivil ConstructionManagement ConsultingWaste ManagementArchitecture and EngineeringResearch & DevelopmentVehicles and FleetRoad & InfrastructureVehicle MaintenanceEnvironmental ServicesFinancial ServicesPharmaceuticalsFood Aid and NutritionGround TransportTraining & EducationConsultingOffice FurnitureLaboratory EquipmentRoads and Highways InfrastructureIT ConsultingBuilding MaterialsAgricultural EquipmentICT EquipmentHealthcare ServicesFinancial AdvisoryUniforms ClothingTraining and Capacity BuildingWarehousingFacilities and CleaningCommunications and PRTransportationCommunity DevelopmentAudit and AccountingFreight and LogisticsCatering ServicesSecurity ServicesPrinting PublishingStaffing AugmentationSite PreparationTelecommunicationsFuel SupplyWeapons SystemsRenovation and RehabilitationMail CourierOil Gas UpstreamEvent ManagementLegal ServicesSurveillance & IsrMilitary LogisticsSurvey & MappingElectrical InstallationScientific ResearchMilitary VehiclesCybersecurityDatabase ManagementResearch and StudiesPower TransmissionWater Supply ProjectsWeapons & MunitionsSanitation SewerageHelpdesk SupportIt Support & Maintenance

Energy procurement in other markets

AustraliaPolandUkraineGermanyFranceUnited KingdomUnited StatesSpainBulgariaNigeriaRomaniaTanzania

Never Miss a Sweden Government Contract

Finding Sweden tenders usually means a local portal, a local registration and someone who reads the language. Get an alert you can read when a new energy opportunity is published there.

Start Free Trial